1. GENERATION IVPLUTONIUM & PROLIFERATION RISKS
Steven C. Sholly
8 November 2007
Presented at: Science or Fiction:
Is There a Future for Nuclear?
2. GEN. IV DESIGNS Gas-cooled reactor (VHTR)?
Water-cooled reactor (SCWR)?
Non-Breeder Fast Reactors (Breeding Ratio = 1)?
Gas-cooled fast reactor (GFR)?
Lead-cooled fast reactor (LFR
Sodium-cooled fast reactor (SFR)?
Breeder Molten salt reactor (MSR)?
3. CURRENT LEVEL OF DESIGN DETAIL VHTR moderate to minimal
SCWR minimal
GFR minimal
LFR almost nonexistent
SFR almost nonexistent
MSR nonexistent (the U.S. is not pursuing this design)?
4. GOAL OF GEN. IV FOR NON-PROLIFERATION Generation IV nuclear energy systems are "exceptionally proliferation resistant" (emphasis added)?
This certainly implies an improvement over the current situation with LWRs, PHWRs and LMRs
5. NONPROLIFERATION STUDY SCHEDULES (DOE)? Methdological framework & demonstration application by 2009
Application to Generation IV reactors from 2009-2017
From 2007-2009 speculation and vague promises
6. VHTR
7. AREVA ANTARES VHTR http://www.areva-np.com/scripts/info/publigen/content/templates/show.asp?P=1559&L=US&SYNC=Yhttp://www.areva-np.com/scripts/info/publigen/content/templates/show.asp?P=1559&L=US&SYNC=Y
8. VHTR Highest priority for the US (for hydrogen production, NGNP)?
Medium-term prospect
Planned by US as once-through fuel cycle (GT-MHR, H2-MHR, PBMR)?
GT-MHR planned by Russia for weapons-grade plutonium burning mission (GT-MHR)?
Technology choices necessary (prismatic core vs. pebble bed core; gas-cooled vs. molten salt-cooled)?
9. VHTR ANTARES - 1 AREVA working on ANTARES VHTR (AREVA New Technology based on Advanced gas-cooled Reactors for Energy Supply)?
Primary circuit is an evolution of the GT-MHR; prismatic core, He-cooled
Secondary cycle is an indirect combined cycle gas turbine incorporating a nitrogen-based Brayton cycle with s Rankine bottoming cycle (300 MWe plus process heat)? http://www.iaea.org/inis/aws/htgr/fulltext/htr2004_a10.pdf
AREVA ANTARES Brochure (2005), http://www.areva-np.com/common/liblocal/docs/Brochure/VHTR_A_2005.pdf
AREVA ANTARES VHTR Process Heat Brochure (2006), http://www.areva-np.com/common/liblocal/docs/Brochure/VHTRadd_A_2006.pdfhttp://www.iaea.org/inis/aws/htgr/fulltext/htr2004_a10.pdf
AREVA ANTARES Brochure (2005), http://www.areva-np.com/common/liblocal/docs/Brochure/VHTR_A_2005.pdf
AREVA ANTARES VHTR Process Heat Brochure (2006), http://www.areva-np.com/common/liblocal/docs/Brochure/VHTRadd_A_2006.pdf
10. VHTR ANTARES - 2 Fuel is TRISO-coated 14% enriched uranium (either oxide or oxycarbide)?
Refueling every 18 months (550 EFPD)?
Avg. burnup 150 GWd/tHM
50% of the core is replaced (510 elements)?
In 60-year plant life, 20,000 spent fuel elements (1770 m3) and 10,000 graphite reflector blocks (840 m3) expected to be generated
At discharge, spent fuel contains 8-9% enriched uranium http://www.iaea.org/programmes/inis/aws/htgr/fulltext/htr2004_b02.pdf
http://www.iaea.org/programmes/inis/aws/htgr/fulltext/htr2004_b05.pdf
http://www.iaea.org/programmes/inis/aws/htgr/fulltext/htr2004_b02.pdf
http://www.iaea.org/programmes/inis/aws/htgr/fulltext/htr2004_b05.pdf
11. VHTR ANTARES - 3 Fuel particles separated from graphite using proprietary process (yet to be developed)?
Once separated, uranium is reprocessed using PUREX process
12. PBMR - 1 PBMR is a modular, pebble bed HTGR design, 400 MWt/165 MWe
Pebbles are 60 mm diameter, with 0.5 mm UO2 fuel kernal containing 9 grams heavy metal
Core contains 452,000 pebbles
Refueling done online (489 fresh pebbles and 2936 recirculated pebbles/day)? http://www.iaea.org/programmes/inis/aws/htgr/fulltext/htr2004_b14.pdfhttp://www.iaea.org/programmes/inis/aws/htgr/fulltext/htr2004_b14.pdf
13. PBMR - 2 Equilibrium fuel cycle, avg. residence time in core is 923 days
Avg. burnup 90.8 GWd/tHM
Plutonium-239 buildup per pebble 1st pass 0.03g; 2nd thru 6th pass 0.042-0.044 (approx)?
Pu-240, Pu-241 & Pu-242 steady buildup in 2nd thru 6th pass
14. PBMR - 3 Designer asserts that high fractions of Pu-240 thru Pu-242 "does not favour the production of a reliable nuclear explosive device"
Designer asserts that heat generation by these isotopes "will cause rapid degradation of the high explosive components of such a device" http://www.iaea.org/programmes/inis/aws/htgr/fulltext/htr2004_b14.pdf
http://www.iaea.org/programmes/inis/aws/htgr/fulltext/htr2004_b14.pdf
15. PBMR - 4 Designer asserts that it is "impossible to produce weapons grade plutonium in a target of U-238 because in a single pass the Pu-240 isotope is larger than 20% of the Pu-239" http://www.iaea.org/programmes/inis/aws/htgr/fulltext/htr2004_b15.pdfhttp://www.iaea.org/programmes/inis/aws/htgr/fulltext/htr2004_b15.pdf
16. GT-MHR
17. GT-MHR Claims of designer:
Spent fuel "self-protecting" (high radiation field and high spent fuel mass and volume)?
Spent fuel diluted with graphite
Pu isotopic pakeup "is degraded well beyond light water reactor spent fuel making it particularly unattractive for use in weapons" http://gt-mhr.ga.com/images/ANS.pdfhttp://gt-mhr.ga.com/images/ANS.pdf
18. NGNP - 1
19. NGNP - 2
20. NGNP - 3
21. SCWR
22. SCWR - 1 Medium-term prospect
Thermal and fast spectrum options
Thermal option is once-through fuel cycle; burnup typical of LWRs
Fast spectrum option plans to use aqueous reprocessing (UREX+) and full actinide recycle
Under investigation by 32 organizations in 13 countries (includes AECL, FzK, CEA, KAERI, INL, VTT, PSI, AREVA, Toshiba)? http://www.tkk.fi/Units/AES/courses/crspages/Tfy-56.181_03/Danielyan.pdf
http://www.aecl.ca/Assets/Publications/Advisory+Panel/2004-RDAP.pdf
http://neri.inel.gov/program_plans/pdfs/appendix_2.pdf
http://www.tkk.fi/Units/AES/courses/crspages/Tfy-56.181_03/Danielyan.pdf
http://www.aecl.ca/Assets/Publications/Advisory+Panel/2004-RDAP.pdf
http://neri.inel.gov/program_plans/pdfs/appendix_2.pdf
23. SCWR 2 Thermal efficiency of 44-45% vs. 33-36% for PWRs & BWRs (44% thermal efficiency achieved on coal-fired units)?
No recirculation pumps, no pressurizer, no SGs, much smaller (pressure suppression) containment
Over 450 supercritical water cooled coal-fired plants in operation
AECL working on CANDU-SCWR concept (50% cheaper on capital & operating costs forecasted)? http://www.aecl.ca/Assets/Publications/Advisory+Panel/2004-RDAP.pdfhttp://www.aecl.ca/Assets/Publications/Advisory+Panel/2004-RDAP.pdf
24. SCWR - 3 CANDU-SCWR may pose typical CANDU problems (high reactor grade plutonium production plus tritium production), albeit at somewhat reduced rates (compared to CANDU-6 or ACR-1200) due to higher thermal efficiency
Proliferation considerations of LWR-SCWR similar to PWRs
Some consideration also given to fast reactor SCWR and VVER SCWR
25. GFR
26. LFR
27. SFR
28. GFR, LFR & SFR Long-term prospects
Intended (by US) to burn actinides
No net breeding of fuel (burners, breeding ratio < 1, GNEP; "converters" with breeding ratio ~ 1); if breeding ratio is not > 1, it's not a "breeder"
US Gen. IV Fast Reactor Strategy (DOE/NE-0130, Dec 2006) http://www.ne.doe.gov/pdfFiles/genIvFastReactorRptToCongressDec2006.pdf
All 3 capable of burner, converter & breeder modes of operation
29. GFR, LFR, SFR GFR closed fuel cycle, onsite fuel cycle facilities
LFR closed fuel cycle, central or regional fuel cycle facilities
SCR two options
150-500 MWe with co-located pyrometallurgical reprocessing
500-1500 MWe with aqueous reprocessing (UREX+) at central facility
30. GFR 1 Similar to GT-MHR (helium-cooled Brayton cycle); supercritical CO2 being considered as well
Uranium-Plutonium carbide fuel, 20% Plutonium (final decision pending), no fertile blanket
Burnup to 250 GWd/tHM
42% thermal efficiency
Being worked on by CEA & AREVA (France), GA & INL (US)?
No operating experience with GFRs (not even a prototype)? http://neri.inel.gov/program_plans/pdfs/appendix_3.pdf
http://anes.fiu.edu/Pro/s9Kha.pdf
http://neri.inel.gov/program_plans/pdfs/appendix_3.pdf
http://anes.fiu.edu/Pro/s9Kha.pdf
31. GFR - 2 France plans < 50 MW Engineering Technology Demonstration Reactor (ETDR) by 2015
GFR demonstration reactor planned for 2025
Fuel for ETDR may be different from GFR Demo
Not a breeder breeding ratio = 1 (self-generating)?
Projected $940 million GFR R&D budget
32. LFR - 1 Basic concept is 45 MWt/20 MWe "Small Secure Transportable Autonmous Reactor" (SSTAR)?
Intended for developing nations and remote communities without grid connections
No direct LFR experience; 80 reactor-years of lead-bismuth eutectic fast reactor experience (2 land-based and 10 naval reactors)?
"Nuclear Battery" concept, 20-30 year sealed core http://neri.inel.gov/program_plans/pdfs/appendix_4.pdfhttp://neri.inel.gov/program_plans/pdfs/appendix_4.pdf
33. LFR - 2 Natural circulation primary, autonomous load following without control rod motion
Supercritical CO2 Brayton cycle energy conversion system
Transuranic nitride fuel (100% N15 to eliminate C14 production)?
Average discharge burnup of 72 GWD/tHM (peak of 120)?
Operation of prototype by 2025
34. SFR - 1 2 design concepts (Japanese SFR, Korean KALIMER)?
Japanese SFR 150-1500 MWe, KALIMER 600-1500 MWe
Burnups 70-200 GWd/tHM and 66-150 GWd/tHM respectively
Possible breeders (Japanese SFR conversion ratio of 0.5-1.2, KALIMER 1.0-1.2)?
Oxide vs. metal fuel choices pending http://neri.inel.gov/program_plans/pdfs/appendix_5.pdfhttp://neri.inel.gov/program_plans/pdfs/appendix_5.pdf
35. SFR - 2 Oxide fuel would involve advanced aqueous reprocessing; metal fuel would involve pyroprocessing
Pyroprocessing demonstrated at very small scale (50g of Pu)?
36. MSR
37. MSR - 1 Indefinitely delayed
Very long-term prospect; not being pursued by the US, but is being pursued in Europe ("several tens of researchers" according to DOE)?
European programme aimed at viability determination by 2013
Possible once-through Th-232/U-233 fuel cycle
Gas-cooled, Brayton cycle turbine
38. MSR - 2 Limited experience (2.5 MWt Aircraft Reactor Experiment; 8 MWt MSRE)?
Nothing known of economics
Research by France (CEA), Czech Republic, and US (ORNL)?
Very high burnup and Pu-242 fraction
Possible use in Th-232/U-233 breeder fuel cycle
39. GENERATION IV INSIGHTS For Generation IV designs, one is primarily concerned about reactor-grade plutonium (no HEU fuel use envisioned)?
SCWR spent fuel is as problematic as LWRs & CANDU "exceptional" proliferation resistance?
Gen. IV fast reactors and VHTR involve very high burnups, resulting in Plutonium isotope mixture that is poorly suited for weapons (compared with LWRs & CANDU)?
40. GENERATION IV CAVEATS - 1 In principle, problems of using RG Pu for a weapon can be overcome by tritium boosting
Theft or diversion of reactor-grade plutonium likely to be accompanied by tritium theft for this reason
Theft of tritium is a broad hint that reactor-grade plutonium has been stolen or diverted
41. GENERATION IV CAVEATS - 2 Note, however, that 3.5% enriched fuel already has about 80% of the SWU of enrichment done to take it to HEU
Example: Consider an initial core for a 1000 MWe LWR, enriched to 3.5%
If you take this uranium and make UF6 feed material, then 11,000 centrifuges can provide you with a 20 kg bomb core per week for almost a year, rejecting tails at 2% Uranium-235
42. GENERATION IV CAVEATS - 3 And you will still have 1700 kg of Uranium-235 in the tails that you can then more leisurely take to higher enrichment, rejecting at a lower tails assay
The net result is something like 100 fission bomb cores for the 4 billion cost of a 1000 MWe LWR and first core (scrap the plant if you like, this is only 40 million per bomb core (assuming you have built the centrifuge enrichment plant anyway)?
Obviously, starting at 5% or 10% or 19.9%, the process goes that much faster
43. NUCLEAR WEAPONS Six types can be distinguished:
Nuclear fission weapon (gun type plus spherical, cylindrical & linear implosion)?
Boosted nuclear fission weapon
Enhanced radiation weapon ('Neutron bomb')?
'Sloika' ('Alarm Clock') multiple concentric shell boosted fission weapon
Thermonuclear (radiation implosion) weapon
Salted weapons ('doomsday bomb')?
44. WEAPONS USABLE MATERIALS Highly enriched uranium (HEU)?
Uranium-233
Super-grade plutonium (Pu-239 typically 97% or higher)?
Weapons-grade plutonium (Pu-239 typically 93% or greater)?
Reactor-grade plutonium
Neptunium-237
Americium-241 (impractical)?
45. WEAPONS USEFUL MATERIALS Tritium (boosting)?
Lithium (especially Lithium-6) (fission-fusion-fission)?
Depleted or natural uranium (tamper; fission-fusion-fission)?
Beryllium (tamper)?
46. REACTOR-GRADE Pu Unquestionably weapons-usable
More highly variable yield
Greater tendency toward predetonation & fizzle or reduced yield
However fizzle is 1 kt or greater for Nagasaki-type design a fizzle yield is not a dud (the damage radius of 1 kt detonation is about one-third that for 10 kt)?
47. NEPTUNIUM-237 - 1 Unquestionably weapons-usable
Even better than HEU (lower spontaneous neutron generation, higher likelihood of full yield)?
Can be used in simple gun-type (Hiroshima) design
All the advantages of HEU without the need for enrichment (available in spent fuel)?
48. NEPTUNIUM-237 - 2 Weapons usability of neptunium 237 established beyond reasonable doubt by experiment at Los Alamos National Laboratory in September 2002
Bare sphere critical mass estimated in the upper 50 to low 60 kg range (compared with 50 kg for HEU)?
Typical 1000 MWe LWR produces 13 kg of Neptunium 237 per year (versus 100s of kilograms of Pu)?
49. GUN-TYPE DESIGN
50. SPHERICALIMPLOSION DESIGN - 1
51. SPHERICALIMPLOSION DESIGN - 2
52. SLOIKA WEAPONS - 1 Sloika (??????) weapons are arranged in multiple concentric layers around a fission pit or boosted fission pit
Layering involves Lithium Deuteride (most effectively Lithium-6) and Tritium
Sloika weapons have been tested by the former Soviet Union and the United Kingdom
53. SLOIKA WEAPONS - 2 Two Russian tests, one with tritium spiked Lithium-6 and a depleted uranium shell, the other without tritium spiking
Yields were 400 kt and 250 kt
These were, respectively, the 5th (12 August 1953) and 23rd (6 November 1955) tests
54. SLOIKA WEAPONS 3 Two British Sloika tests, one using a depleted uranium shell and one using a highly enriched uranium shell
Yields were 98 kt (DU shell) and 720 kt (HEU shell)
These were, respectively, the 5th (Mosaic G2, 19 June 1956) and (Grapple 2/Orange Herald, 31 May 1957) 11th (31 May 1957) tests
One source lists Grapple/Purple Granite (19 June 1957, 200 kt) as a Sloika (with an aluminum shell)?
55. SLOIKA WEAPONS - 4 The British Orange Herald Device
56. SLOIKA WEAPONS - 5 In the Russian & British cases, both abandoned the Sloika after successfully testing a radiation implosion weapon (lighter weight & higher yield)?
But Sloika remains a viable and very "dirty" design & is well within the capability of any entity that can produce an implosion weapon
Deliverable by rail, ship, submarine, or aircraft
57. SLOIKA WEAPONS - 6 Sloika (400 kt)?
2nd Generation Implosion Weapon ("Joe-2")?
1st Generation Implosion Weapon ("Joe-1")?
58. SLOIKA WEAPONS - 7 It is possible that Israel has developed a Sloika weapon
This Mordechai Vanunu photo could be interpreted as a Sloika
59. HOW HARD IS IT TO DESIGN A NUCLEAR WEAPON? - 1 From 1941-1945, the United States produced 4 nuclear devices of two different designs & developed plutonium production & separation as well as two different uranium enrichment processes in 3 years and spent about $20 billion in (2004 dollars based on CPI index escalation).
60. HOW HARD IS IT TO DESIGN A NUCLEAR WEAPON? - 2 Subsequent modest nuclear weapons programmes (compared with the the US & Russia) are estimated to have cost 3.5-5 billion based on the experience from China, India, and South Africa. The cost of developing nuclear weapons has come down at least 4-fold since 1945.
61. HOW HARD IS IT TO DESIGN A NUCLEAR WEAPON? - 3 In the middle 1960s, the predecessor of Lawrence Livermore National Laboratory (one of two nuclear weapon design labs in the US) conducted the so-called 'Nth' Country Experiment.
Three individuals with B.S. degrees (2 in physics) were hired to design a nuclear weapon using only publicly available information. (One of the team quit, and was replaced by an Army Lieutenant with a PhD.)?
62. HOW HARD IS IT TO DESIGN A NUCLEAR WEAPON? - 4 The team deliberately selected a spherical implosion device using plutonium because it was more challenging.
Three person-years of effort was spent on the design (in 2.5 calendar years). The resulting device was too large for a missile, but could be carried by aircraft or truck.
The design was evaluated using nuclear weapon codes at the time it was concluded that a viable design had been produced.
63. HOW HARD IS IT TO DESIGN A NUCLEAR WEAPON? - 5 Carey Sublette (curator of the Nuclear Weapons FAQ) has written, regarding the Nth Country Experiment, In the years since, much more information has entered the public domain so that the level of effort required has obviously dropped further. This experiment established an upper limit on the required level of effort that is so low that the hope that lack of information may provide even a small degree of protection from proliferation is clearly a futile one.
64. HOW HARD IS IT TO DESIGN A NUCLEAR WEAPON? - 6 The US Deparment of Energy has reportedly changed the security force criterion for facilities with weapons-grade material from preventing theft to preventing insertion of the material into a nuclear device and detonation in place
65. FOR A COPY ssh@irf.univie.ac.at