100 likes | 908 Views
Micro Gas Turbine Engine. Goals 1-10 KW of clean, portable, electrical energy Increase efficiency Utilize HiTAC (High Temperature Air Combustion) on a small scale engine. Personal Responsibilities Designed physical assembly of engine Machined and parts 3-D CAD drawing Tested combustor
E N D
Micro Gas Turbine Engine Goals • 1-10 KW of clean, portable, electrical energy • Increase efficiency • Utilize HiTAC (High Temperature Air Combustion) on a small scale engine. Personal Responsibilities • Designed physical assembly of engine • Machined and parts • 3-D CAD drawing • Tested combustor • Develop viable way to attach DC motor