290 likes | 388 Views
The energizes. Energy plus house Leusden. made by: Bonne Postma&Pieter Zuidema. Index. Installations . Geothermal power pump. Cost calculation Geothermal power pump. Solar collectors. Solar panels. drawings . architectural . H-tec. benefits electric car . Architect Johannes out.
E N D
Energy plus house Leusden made by:Bonne Postma&Pieter Zuidema
Index • Installations. • Geothermal power pump. • CostcalculationGeothermal power pump. • Solar collectors. • Solar panels. • drawings. • architectural. • H-tec. • benefitselectriccar. • Architect Johannes out. • General information.
Installations • Geothermal power pump. • Solar collectors. • Wind turbine. • Solar panels.
Geothermalpowerpump • The ground heat exchanger. • The heat pump. • Delivery system.
Costing Geothermalpowerpump Geothermal power pump € 7.000source € 6.000insulation € 3.500LTV € 4.000Installation € 2.000total €22.500 off subsidy € - 5.000 Rest €17.500
Solarcollectors • working solar collectors
Architectural • Well isolated. • Materials with high rc (6.9) • Base.
H-tec • Electric car. • 1 to 100 8,0 seconds • Range 400 km • Battery lithium-ion • Type elektrisch • Topspeed 160 km/h • power 101 pk (75 kW)
Benefits electric car • No BPM • No addition • No road tax. • No CO2 emissions • 10.000 charing points • Super modern cars • No noise • Home charging electric car
Architect Johannes out • Fellow owner InnoConstruct B.V • Architict of his own house.
General information • Address: Railway Damreesche 22, 3832 KR LeusdenStart of construction: September 2007Completion: March 2009Dwellingsize: 1,000 cubic metersConstruction cost: 600.000 to 700.000 eurosClient: InnoConstruct BV + www.innoconstruct.nlUser: John and partner Marianne OutArchitect: John OutBuilding system: Styro Stone + www.styrostone.nlFoundation: Misapor + www.misapor.chMobility: Eneco + www.eneco.nlWind: Everkinetiq + www.everkinetiq.nHome: Automation: Moeller + http://benelux.moeller.netInstallation: Kath, Wolff & Partner + www.kath-wolff Partner.Energy Management: Nedap + www.nedap.nlWindows and heat pump: Schüco + www.schueco.comClimate: Siegmund + www.eht-siegmund.comLandscaping: Va + Voumwww.vavoum.comWillowFence: The Vlechterij + www.vlechterij.nlMobility: Eneco + www.eneco.nlCalculation of energy efficiency: Consultancy Nieman + www.nieman.nl
Conclusion • Buildingmaterials • Outside wall • Piles
Made by: Jacob and Feike Energy-Plus-House Dortmund
Index • First project • Second project • Heating • Energy generation • Sustainable elements • Drawings of the house • Conclusion • End of the presentation
First project • First project was Czech Republic • House • Hotel • Had different sustainable facilities • Little of information about the energy plus house
Second project • Second project is Dortmund, Germany • Designed by a group of students • Build in 2007
Heating • Using blades with solarcells • No Geothermal • Using Heat pumps for hot water and heat indoors • Much insulation applied
Energy generation • Use of a second facade • Blades with solar cells on the South, East and West side • Solar panel on the roof • Connected to the mains, but only to the selling energy
Sustainable elements • North glass is four-layer • East- South and West side are three-layer
Drawings of the house Section wall with Blades Floor plan: first floor + second floor
Conclusion • Solar panels are nicely incorporated into the blades. • House produces more energy than it cosumes.
Made by: Jacob, Feike, Pieter and Bonne Foreign project to domestic project
Foreign project • Solar cells on blades • Using a heat pump for heating and making electricity • Has a veranda that saves heat • Modern look • Remainingenergy is sold
Domestic project • There is an electric car drive on the remaining energy • Traditional look • Using geothermal and sun for making heat • Base is made by waste
Conclusion • Choice goes to Leusden • Leusden has a traditional look • The remaining energy is better spent • Base is made by waste