An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 ROV for telescope construction: possible use of Cougar Jean Roux, AIM for CPPM

  2. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 ROV for telescope construction Do we need Rov? Jean Roux, AIM for CPPM

  3. Junction Box Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Package IL shore SJB1 SJB2 SJB3

  4. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Turret IL 2600m IL 1 BJ frame Reprise d’effort

  5. Deployment Pegasus Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Fast winch Câble eop hook, camera, propulsion xy

  6. Approch Pegasus Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Propulsion camera IL 1

  7. Hook and lift Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 IL

  8. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Interlink

  9. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 DU Interlink Connect DU on deck Test DU via BJ meoc

  10. DU deployment Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Interlink meoc

  11. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 ROV for telescope construction and maintenance YES we need To do what?

  12. Telescope construction & maintenance underwater operations Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 • MEOC survey and current check

  13. Telescope construction & maintenance underwater operations Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 • MEOC survey and current check • DU visual inspection

  14. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Telescope construction & maintenance underwater operations • MEOC survey and current check • DU visual inspection • Sismo installation

  15. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Telescope construction & maintenance underwater operations • MEOC survey and current check • DU visual inspection • Sismo installation • Unscrew BSS release bolts

  16. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Telescope construction & maintenance underwater operations • MEOC survey and current check • DU visual inspection • Sismo installation • Unscrew BSS release bolts • Manipulate IL turrets

  17. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Telescope construction & maintenance underwater operations • MEOC survey and current check • DU visual inspection • Sismo installation • Unscrew BSS release bolts • Manipulate IL turrets • Operate wet meatable connectors …..and…..

  18. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 ROV for telescope construction & maintenance underwater operations • MEOC survey and current check • DU visual inspection • Sismo installation • Unscrew BSS release bolts • Manipulate IL turrets • Operate wet meatable connectors 80% unexpected 20% expected

  19. Possible use of COUGAR Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009

  20. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009

  21. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Cougar versus Victor Cougar Victor no dive lot of dives freelance crew permanent crew no ballast 70kg ballast no basket large basket 2 five functions man 1 five functions man + a XYZ man & 1 seven functions man same power same power small support vessel big support vessel available not so available cheaper more expensive

  22. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Cougar Victor no dive lot of dives freelance crew permanent crew no ballast 70kg ballast no basket large basket 2 five functions man 1 five functions man + a XYZ man & 1 seven functions man same power same power small support vessel big support vessel available not so available cheaper more expensive Suggestion: find other activities before KM3 construction & try to contract same crew everytime

  23. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Cougar Victor no dive lot of dives freelance crew permanent crew no ballast 70kg ballast no basket large basket 2 five functions man 1 five functions man + a XYZ man & 1 seven functions man same power same power small support vessel big support vessel available not so available cheaper more expensive Suggestion: think about a large tool box deployed on sea bed or on the TMS if weather fine

  24. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Cougar Victor no dive lot of dives freelance crew permanent crew no ballast 70kg ballast no basket large basket 2 five functions man 1 five functions man + a XYZ man & 1 seven functions man same power same power small support vessel big support vessel available not so available cheaper more expensive manipulation could take more time

  25. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Cougar Victor no dive lot of dives freelance crew permanent crew no ballast 70kg ballast no basket large basket 2 five functions man 1 five functions man + a XYZ man & 1 seven functions man same power same power small support vessel big support vessel cheaper more expensive available not so available

  26. Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Cougar Victor no dive lot of dives freelance crew permanent crew no ballast 70kg ballast no basket large basket 2 five functions man 1 five functions man + a XYZ man & 1 seven functions man same power same power small support vessel big support vessel cheaper more expensive available not so available

  27. Keys for success Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 Joint meeting WP2, WP3, WP4, WP5 Paris 23-24 February 2009 • High level of activities • Trained Rov crew • Procedures written and discussed • Expertise of operation manager • Reasonnable tasks for Rov class