1 / 16

The IP5 view on the future of classification

Explore the IP5's vision to streamline patent examination, eliminate duplication, and improve quality. Learn about the common hybrid classification projects and goals set by the IP5 offices.

Download Presentation

The IP5 view on the future of classification

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The IP5 view on the future of classification IPC Committee of Experts 16-20 March 2009

  2. The IP5 offices: • European Patent Office (EPO) • Japan Patent Office (JPO) • Korean Intellectual Property Office (KIPO) • State Intellectual Property Office of the People's Republic of China (SIPO) • US Patent and Trademark Office (USPTO) The IP5 view  The IP5 offices

  3. History: The IP5 Heads of Office met in Jeju, Korea in October 2008 where they cemented a vision and agreed a roadmap. " The elimination of unnecessary duplication of work among the IP5 offices, the enhancement of patent examination efficiency and quality and guarantee of the stability of patent right "

  4. Ten Foundation Projects ProjectLeader Common documentation EPO Common hybrid classification EPO Sharing and documenting search strategies USPTO Common search and examination support tools USPTO Common access to search and examination results JPO Common application format JPO Common training policy KIPO Mutual machine translation KIPO Common rules for examination practice and quality control SIPO Common statistical parameter system for examination SIPO The IP5 view  Foundation projects

  5. Goals for Common Hybrid Classification • Eliminate of unnecessary duplication of work • Improve international searching efficiency • Utilize the strengths of existing internal classification systems • Enhance patent examination efficiency and quality The IP5 view  Goals

  6. The matter is perceived as urgent... 1 450 000 1 125 000 The IP5 view  Statistics

  7. Common Approach for a Hybrid Classification • Develop IPC to the necessary depth • Start pilot project to evaluate cost and benefits • Use mapping tools between existing internal schemes • identify areas for common scheme • assist in searching using internal schemes • Co-operate closely with WIPO The IP5 view  Hybrid classification

  8. What to address at IPC level (~ CE404...) • Simplify core/advanced structure • Revision cycles • Which body should be in charge of revision work • Speeding up revisions The IP5 view  IPC

  9. Core - advanced level • One IPC scheme only (= "advanced level") • Core level just becomes a way of applying the "one IPC" • Use subclasses and main groups • Offices may choose to classify up to subclass/main group level or to the full IPC • Indication that classification was made up to subclass/main group level only must be present on document record • Change name of "Core Level" to "Subclass/main group level" ? The IP5 view  IPC

  10. Revision cycles • IP5 strategy: introduce higher amount of changes • 3 month interval not needed • 6 month interval = good compromise • spread reclassification work • early publication to allow preparation • Allow skipping interval if no significant changes present The IP5 view  IPC

  11. Body in charge of revision (I) • Structure for efficient discussion • "Task force" or "Subcommittee" vs. "whole group" • "Main (re-)classifying" offices vs. "Searching" offices • Who should be in charge? • A new Subcommittee ? • IPC/WG ? The IP5 view  IPC

  12. Body in charge of revision (II) Possible scenario Main stakeholder offices in charge of decision-making • Permanent members of the body: • Major reclassifying offices • Supplementary members: • Offices proposing projects • Rapporteur offices The IP5 view  IPC

  13. Speeding up revisions • Minimize detailed revision work • best available schemes vs. quest for perfection • minimum reclassification work IP5 offices plan to: • Transfer block subdivisions from internal systems into the IPC: • Subclasses • Large main groups, etc. • Select from one of the existing schemes The IP5 view  IPC

  14. Timeline • Phase I: 2009-2010 - Planning • Planning and identification of pilot projects • Develop requirements for a mapping and scheme viewing tool • Set-up a training framework • Phase II: 2010-2011 -Pilot projects Implementation of pilot projects The IP5 view  Timeline

  15. Phase III: 2012-2016 - Implementation • Phase IV: 2017-2018 -Internal indexing schemes • Phase V: 2019-2021 - Completion of common hybrid classification

  16. Thank you for your attention

More Related