10 likes | 98 Views
Needed Direction from BIC. Issue #1: Using DA bid for RT bids when RT bid missing for Local Reliability billing ISO looking for direction for paying power supplier for local reliability when HAM bid missing.
E N D
Needed Direction from BIC • Issue #1: Using DA bid for RT bids when RT bid missing for Local Reliability billing • ISO looking for direction for paying power supplier for local reliability when HAM bid missing. • Issue #2: NYISO using a HAM bid from a generator in a group as the HAM bid for other units in the group that are missing a bid • ISO looking for direction for paying power supplier for local reliability when HAM bid missing.