1 / 13

Summary on Maidanak Users activity: 1yr after

Summary on Maidanak Users activity: 1yr after. Mansur Ibrahimov, Shuhrat Ehgamberdiev UBAI, Tashkent. 2 nd Maidanak Users Meeting, June 21 2010. Resume of the 1 st meeting (SNU Korea):. Uninterrupted power supply Stable internet connection Telescopes: mirror recoating

redell
Download Presentation

Summary on Maidanak Users activity: 1yr after

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary on Maidanak Users activity: 1yr after Mansur Ibrahimov, Shuhrat Ehgamberdiev UBAI, Tashkent 2nd Maidanak Users Meeting, June 21 2010

  2. Resume of the 1st meeting (SNU Korea): • Uninterrupted power supply • Stable internet connection • Telescopes: mirror recoating • Improving of living conditions: transportation, dormitories, water supply technician and night assistance teams

  3. Maidanak: telescopes and instruments 6 telescopes: 1.5m, 1m, 4x60cm (4 of them in operation) 5 CCDs: SI 600 Series 4K, SITe 2000x800, 2x FLI IMG 1K, SBIG ST9-XE 0.5K Direct Imaging only (in optic), No IR No Spectra

  4. Stable Internet: done ! • 2007-2010: extremely hard paperwork • Satellite based VSAT system, www.steccom.ru • Owner: AstroTel Ltd, Boris Satovski (under agreement with UBAI) • 8 MB/sec down, 384 KB/sec up (chargeable down/up) • Cost estimation: 1 GB/month for US$ 700

  5. Telescopes: recoating - partially done • June 2009- June 2010: recoated at Okayama Obs., Japan 60 cm 48 cm • Funding: JSPS+NAOJ+Okayama (1 wooden box, 2 mirrors, round-trip shipment) • Not yet recoated: 1.5 m 1.0 m 2 more 60 cm

  6. Telescopes: cleaning – two 60cm • June 2009 – 60cm mirror at Zeiss600-Kiev • October 2009 – 60cm mirror at Zeiss600-Moscow • October 2008 – 1.5m mirror at AZT-22 (~1mag deeper) (next cleaning – fall 2010 or fall 2011)

  7. Telescopes: reflectance as of Oct 2009 • 1.5m – > 80 % • 1.0m – < 50 % • 2x60cm – 65-75 % (Okita Kiichi-san, Okayama Obs.)

  8. Uninterrupted Power Supply: no changes • Governmental supply: failed and becoming more trouble year by year • Diesel + oil supply: the ONLY way for Maidanak Users • Current cost estimations in US$ : Diesel - 50-60K Oil supply – 40K (for 40 tons)

  9. Uninterrupted Power Supply: 60cm scopes • Individually Power Supplied Scopes (using powerful battery): Zeiss600-Kiev – almost done Zeiss600-Moscow – in project for 2010 (Artamonov and Magnitskii, SAI Russia) FYI: Individually Power Supplied system had been already realized at AstroTel-Maidanak Telescope (AMT-1) Satovski (AstroTel Ltd)

  10. Living conditions: no changes • Transportation problem: Tashkent-Samarkand by train – no problem Samarkand-Maidanak – still a problem need 2 cars (at least) for transportation/logistic • Dormitories: 2 dormitories need to be reconstructed and/or repaired • Water supply: still primitive (bringing by truck from the spring) 5-6 times/year no regular shower, no WCs

  11. Tech and night ass teams: no changes • 1.5m scope: 1 regular night assistant from Kitab 2-3 visiting observers/month (summer-fall seasons) • 1m scope: no regular program, no assistant at all • two 60 cm scopes: 1 episodically observing assistant from Tashkent 1-2 visiting observers/month (summer-fall seasons) • Technician team: 5 people managed by Abbas Aliev

  12. Summary of 1yr activity: • Internet – done • Recoating – 1 mirror done, 4 mirrors not yet • Power supply – nothing changed, currently ~100K$ individually buttery supplied system ? • Living conditions – nothing changed: transportation, dormitories, water • Tech+ night ass teams – nothing changed: the both teams should be enlarged

  13. That’s all. Thank you.

More Related