70 likes | 178 Views
Drift Tube QC Meeting CMS meeting – Catania – 18 th June 2001. Status of QC at various production sites Compoments Bologna/Protvino Torino Chamber Aachen, Madrid, Padova
E N D
Drift Tube QC Meeting CMS meeting – Catania – 18th June 2001 • Status of QC at various production sites Compoments Bologna/Protvino Torino Chamber Aachen, Madrid, Padova - Data Base status report Simone, Marina - AoB CMS meeting, Silvia Maselli Torino
New Version of the QC document Version 6.2 http://www.to.infn.it/activities/experiments/ cms/QualityControl.html Modifications w.r.t. to 6.1 version: - Bar Code numbers reserved for Alignment items - Added tables defining NEW Specific Code CMS meeting, Silvia Maselli Torino
QC for AL Plates production Status of QC for Al Plates production Exercise to test the QC procedure foreseen in the document CMS meeting, Silvia Maselli Torino
QC for AL Plates production CMS meeting, Silvia Maselli Torino
QC for AL Plates production Production Data Base • A window panel is provided to the operator to follow the steps of the production workflow. • All data are recorded automatically into an Excel file. • A traveler file associated to each plate is also automatically generated. • Record data into Production Data Base CMS meeting, Silvia Maselli Torino
Info in Data Base - change proposal Production Data Base Bar code classification = 8 surfaces DataBase classification = 5 plates The up surface is identifying the plate In the Data Base: AlRaw OPERATION BATCH NUMBER SITE DATE Plate ID_PL LX LY BATCH NM VER DATE PlateComment ID_PL Batch_mu Batch_Pechiney Batch_MyInd Batch_AlInd PlateEnv ID_PL TEMP HUMID PRESS DATE TIME COMMENT PlateChangeStripBatch ID_PL SIDE NUMBER Batch_mu PlateChangeMylarBatch ID_PL SIDE NUMBER Batch_mu PlateDimTest ID_PL n_measurments LOCATION DATE PlateNomPosStrip ID_PL A C E NSTRIP LSTRIP PlateMeasAllStrip ID_PL TYPE NM MEAS(1)...MEAS(NM) CMS meeting, Silvia Maselli Torino
Quality Control Meeting – summary CMS meeting Catania – 18.06.2001 Production Data Base • Status of QC Al-Plate production in Torino Silvia • Status of QC Chamber production in Aachen and Legnaro Hans , Ezio - QC procedures and tests during production follow the Document - Check during production : List of QC tests QC flow diagrams QC tests numbers Provide the operator of synthetic instructions possibly written in mother language • Production Data Base: Simone, Marina - Al-Plates component information will be adapted to the existing DB structure. ( Only part of information will be stored) - Use of real Data Cards to build SL - Send and Receive actions implemented in the Java Interface CMS meeting, Silvia Maselli Torino