Production Methods. Waterfall Agile Scrum XP Kanban Hybrid. Production Methods. Design Documents Technical Documents Staff availability Risk list Task breakdown estimates Design, Art, Code, Audio Leads. Inputs. RELEASE. DESIGN. BUILD. TEST. Waterfall.
E N D
Waterfall • Agile • Scrum • XP • Kanban • Hybrid Production Methods
Design Documents • Technical Documents • Staff availability • Risk list • Task breakdown estimates • Design, Art, Code, Audio Leads Inputs
RELEASE DESIGN BUILD TEST Waterfall
Task list, dependencies, resource • Microsoft Project • Spreadsheet Tasks are detailed and rigid Waterfall
DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST RELEASE RELEASE RELEASE Scrum
Product Backlog • Sprint Backlog
DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST RELEASE RELEASE RELEASE Scrum
Daily Scrum • Who is in it? • How long will it take? • What do we say? • War room
Story Points • Ideal Days • Velocity • How much effort can X deliver in sprint? Estimation
Pros • Agile / Adaptable • Feature based • Team ‘owns’ work • Cons • Work slips easily • ‘Soft’ deliverables • Dependencies are lost Scrum vs Waterfall
Waterfall as manager • Waterfall: manages Sprints • Waterfall: ‘defined’ work • Waterfall: dependencies • Waterfall: External work • Scrum: for ‘creative’ / ‘research’ Hybrid