40 likes | 114 Views
QC STATUS at MADRID. Mary-Cruz FOUZ. CMS Week March 2001. Tests during construction. Wire positions:. Automatica ll y recorded in a file. Wire Tension :. The new tool from Aachen is available. The values are automatica l ly recorded in a "standard" ASCII file. Corner Blocks :.
E N D
QC STATUS at MADRID Mary-Cruz FOUZ CMS Week March 2001
Tests during construction. Wire positions: Automatically recorded in a file. Wire Tension: The new tool from Aachen is available. The values are automatically recorded in a "standard" ASCII file Corner Blocks: Automatically recorded in a file. A Bar Code reader is being integrated with the software programs used during construction. Procedures for conversion from our own files to "standard" ASCII files are starting to be developed. M.C Fouz
Tests on the assembly SL (I). GAS Tests: Values automatically recorded on a file, each XX minutes. Present Status Next HV T E S T S The system allows to give HV to 1SL. Granularity 4 I-beam Channels 4 Strip Channels 8 Wire Channels Values automatically recorded on a file everyXX minutes. During this year a new system (CAEN 1527) with final granularity will allow power 1Chamber Present Status Next The DAQ system record cosmic data. Offline programs (based on testbeamanalysis) are used to analyze the data. ROB prototype. The system allows to take data up to 96 channels 2 New comercial TDCs from CAEN will be implemented during next month C O T S E M S I T C S ALL The data will be recorded on DISK. M.C Fouz
Tests on the assembly SL (II). Thickness: A first manual measurement with a calibre is performed. A measurement in the Chamber mounting table is made during the assembly and the values are automatically recorded in a file. M.C Fouz