Storage ring facility at HIE-ISOLDE: Technical Design Report

Motivation. TSR and ISOLDE. Physics. Planning. Storage ring facility at HIE-ISOLDE: Technical Design Report. Klaus Blaum (MPI-Kernphysik, Heidelberg) Riccardo Raabe (IKS, KU Leuven) Phil Woods (Univ. of Edinburgh) and the TSR@HIE-ISOLDE Collaboration. Motivation. TSR and ISOLDE. Physics.

reya
Download Presentation

Storage ring facility at HIE-ISOLDE: Technical Design Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Motivation TSR and ISOLDE Physics Planning Storage ring facility at HIE-ISOLDE:Technical Design Report Klaus Blaum (MPI-Kernphysik, Heidelberg)Riccardo Raabe (IKS, KU Leuven)Phil Woods (Univ. of Edinburgh)and the TSR@HIE-ISOLDE Collaboration

  2. Motivation TSR and ISOLDE Physics Planning Collaboration: 129 scientists from 47 institutions in 19 countries

  3. Motivation TSR and ISOLDE Physics Planning A storage ring at an ISOL facility • Advantages • With respect to in-flightstorage rings • High intensity • Cooler beams • With respect to “direct” beams • Less background(target, beam dump) • Improved resolution • CW beam Physics programme AstrophysicsCapture, transfer reactions7Be half life Atomic physicsEffects on half livesDi- electronic recombination Nuclear physicsReaction studiesIsomeric statesHalo statesLaser spectroscopy Neutrino physics

  4. Motivation TSR and ISOLDE Physics Planning Coupling to HIE-ISOLDE: configuration Possible TSR installationabove the CERN cable-tunnel Tilted beamline coming upfrom the machine

  5. Motivation TSR and ISOLDE Physics Planning Coupling to HIE-ISOLDE: configuration Transfer line

  6. Motivation TSR and ISOLDE Physics Planning Coupling to HIE-ISOLDE: injection EBIS time profile fits injection in TSR Multi-turn injection: multiplication factor = • H acceptance TSR • beam emittance

  7. Motivation TSR and ISOLDE Physics Planning Coupling to HIE-ISOLDE: injection EBIS time profile fits injection in TSR Multi-turn injection: multiplication factor = (of the instantaneous current!) compress < ≈35 µs • H acceptance TSR • beam emittance Beam emittanceMPIK 1.5 mm mrad HIE-ISOLDE 3.5 mm mrad

  8. Motivation TSR and ISOLDE Physics Planning Coupling to HIE-ISOLDE: injection • EBIS time profile fits injection in TSR • Multi-turn injection: • multiplication factor = • Electron cooling • Large gains only limited by lifetime • H acceptance TSR • beam emittance

  9. Motivation TSR and ISOLDE Physics Planning Coupling to HIE-ISOLDE: injection • EBIS time profile fits injection in TSR • Multi-turn injection: • multiplication factor = • Electron cooling • Large gains only limited by lifetime • Cooling times ≈ 1 sin any case injection max 5 Hz • H acceptance TSR • beam emittance Tc = k A/q2

  10. Motivation TSR and ISOLDE Physics Planning Coupling to HIE-ISOLDE: injection • EBIS time profile fits injection in TSR • Multi-turn injection: • multiplication factor = • Electron cooling • Large gains only limited by lifetime • Cooling times ≈ 1 sin any case injection max 5 Hz • H acceptance TSR • beam emittance Tc = k A/q2 store ions in REXTRAP

  11. Motivation TSR and ISOLDE Physics Planning Coupling to HIE-ISOLDE: injection • EBIS time profile fits injection in TSR • Multi-turn injection: • multiplication factor = • Electron cooling • Large gains only limited by lifetime • Cooling times ≈ 1 sin any case injection max 5 Hz • Charge state • Rigidity TSR • Storage lifetimes • Cooling times • Experiments • H acceptance TSR • beam emittance

  12. Motivation TSR and ISOLDE Physics Planning Coupling to HIE-ISOLDE: injection • EBIS time profile fits injection in TSR • Multi-turn injection: • multiplication factor = • Electron cooling • Large gains only limited by lifetime • Cooling times ≈ 1 sin any case injection max 5 Hz • Charge state • Rigidity TSR • Storage lifetimes • Cooling times • Experiments • H acceptance TSR • beam emittance (stripper foil) [charge breeder upgrade]

  13. Motivation TSR and ISOLDE Physics Planning In the ring: survival times, beam handling • Survival times • Coulomb scattering,electron capture and stripping • Residual gas, electrons in the cooler and gas target • Experiment reproduced by theory electron capture multiple scattering total 12C6+

  14. Motivation TSR and ISOLDE Physics Planning In the ring: survival times, beam handling • Survival times • Coulomb scattering,electron capture and stripping • Residual gas, electrons in the coolerand gas target • Experiment reproduced by theory • Acceleration and decelerationlongitudinal bunching • Mass-selective accelerationseparation M/ΔM ≈ 3000(few hundreds ms) 12C6+

  15. Motivation TSR and ISOLDE Physics Planning Back to ISOLDE: extraction Extraction timesbetween 0.1 s and 30 s Efficiency (cooled beam) ≈90% Properties similar to thoseof the cooled beam Use in external experiments(HELIOS…)

  16. Motivation TSR and ISOLDE Physics Planning Beam usage ≈1 s injection no cooling ITSR = IHIE-ISOLDE × frev / finj cooling ITSR = IHIE-ISOLDE × frev × τ injection stacking Exploitation Measurement Acceleration/deceleration Mass separation Extraction

  17. Motivation TSR and ISOLDE Physics Planning Physics programme Conveners

  18. Motivation TSR and ISOLDE Physics Planning Physics programme Conveners

  19. Motivation TSR and ISOLDE Physics Planning Half life of H-like 7Be Half life of 7Be in the Sun? Produced νe rates τ7Be≈300 s τ7Li≈9000 s cooling 2.3 s injection≈108 ions stacking decay

  20. Motivation TSR and ISOLDE Physics Planning Reaction measurements cooling ≈0.5 s injection≈105 ions measurement ≈1-2 s EXL collaboration

  21. Motivation TSR and ISOLDE Physics Planning Extracted beams cooling ≈0.5 s injection≈105 ions stacking ≈τ extraction ≈5 s Cooled beamsin HELIOS-type spectrometer

  22. Motivation TSR and ISOLDE Physics Planning Planning Estimates made for disassembly,transportation, reassembly Building (≈ 3 MCHF)to be requested from CERN Hardware: working groupsthe Collaboration seeks funding Running costs and manpowerprovided by the Collaboration

  23. Programme – Astrophysics

  24. Programme – Atomic physics

  25. Programme – Nuclear physics