1 / 11

ASTI Transportation Systems

ASTI Transportation Systems. Missouri DOT I-44, Smart Work Zone System St. Louis County Noah Jenkin ASTI Transportation Systems, Inc. 302-328-3220 noah@asti-trans.com. Smart Work Zone System Goals.

rhys
Download Presentation

ASTI Transportation Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ASTI Transportation Systems Missouri DOT I-44, Smart Work Zone System St. Louis County Noah Jenkin ASTI Transportation Systems, Inc. 302-328-3220 noah@asti-trans.com

  2. Smart Work Zone System Goals • The goal of this system is to provide advance traffic condition information to motorists at key decision points due to construction activity. • Alternate Routing • Drive time through the work zone • Speeds ahead • Slowed/stopped traffic ahead

  3. Tremendous Specification!!! • Very specific. • Hardware reliability- Autonomy, auto alerts for low battery voltage, sensor must have min 230 watts of solar. • Performance percentages for data collection- i.e.. volume data 5% of truth. • All current and historical traffic data, must be available through project webpage • Clear testing plan to verify all performance measure are satisfied.

  4. ASTI’s System Hardware • Real-Time Workzone Management Systems • 7, Queue Trailers- Wavetronix HD Technology • 4, Wanco VMS • 2, BlueToad Bluetooth sensors • Digital Communications Package • ASTI’s CHIPS Software/Webpage • How It works- web based, polling.

  5. CHIPS Software Thresholds • Speeds greater than 40mph: • STAY ALERT • DO NOT TEXT AND DRIVE • Speeds between 15 mph and 40 mph: SLOWED TRAFFIC Y MILES- ahead • XX MINS 109 to 141- route • Speeds less than 15 mph: • STOPEED TRAFFIC Y MILES- ahead • XX MINS 109 TO 141- route

  6. MODOT Was Hands On • DOT overrode the vms to increase system effectiveness. • Accident past Lewis Rd • Roadwork mile marker 269 • 1 Lane Traffic • Lane Closures • Lane Shifts Ahead

  7. Results • ASTI does not have access to accident reports. • Motorists received accurate traffic information 24/7 at a location they could actively use. • DOT received outstanding traffic data 24/7 which allowed them to better manage this particular construction project as well as future projects- all data is the property of the DOT.

  8. Questions / Comments? Noah Jenkin ASTI Transportation Systems Inc. 302-328-3220 noah@asti-trans.com

More Related