THEMIS Electric Field Instrument (EFI) Mission CDR The THEMIS EFI Team
THEMIS Electric Field Instrument (EFI) Mission CDR The THEMIS EFI Team. Outline. Personnel and Organization Summary of EFI Status at MCDR Requirements, Specifications, and Design Compliance Requirements Top-Level Design Error Budgets Status of Subsystem Design, Fabrication, and Testing
314 views • 14 slides