1 / 15

Transport Canada’s Airport Regulatory Plan

Transport Canada’s Airport Regulatory Plan. SWIFT 2011. Presentation Overview. Major Regulatory Initiatives TP 312 5 th Edition Review Project Regulatory Review of the IFR Regulations (“Gate to Gate Concept”) Change to Airport Certification Criteria (“Scheduled Service”

rich
Download Presentation

Transport Canada’s Airport Regulatory Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transport Canada’s Airport Regulatory Plan SWIFT 2011

  2. Presentation Overview • Major Regulatory Initiatives • TP 312 5th Edition Review Project • Regulatory Review of the IFR Regulations (“Gate to Gate Concept”) • Change to Airport Certification Criteria (“Scheduled Service” • Land and Hold Short Operations (LAHSO) • RESA • Guidance Material Initiatives (Advisory Circulars)

  3. TP312 Review Project Initial Plan • Regulatory Process to amend a CAR • Cabinet Directive on Streamlining Regulations • CARAC regulatory process • 5 - 8 years !!! • More efficient process?

  4. TP312 – 5th editionBenefits • Faster introduction to clients/users • Reduced regulatory process • Currently incorporated by reference (302.07) • No changes to CAR 302 (at this time) • Familiarity with structure/content of current document • Eventual merging into CAR 322 • Facilitates the transition (writing, understanding,…)

  5. NPA Drafting • Last consultation with TC-Industry group - March 2011 • Drafting into 5th edition – June 2011 • Translation – October/November 2011 • Quality assurance of the French document – December 2011 – January 2012 • Start of public consultations (March/May 2012)

  6. CARACconsultation process • Provide a 4 month formal comment period • CARAC to be scheduled after assessment of comments received • Disposition of comments to be included in CARAC agenda

  7. Phase VI – Justice Drafting & Gazette Not applicable Standards in use - Objective: 2012 /2013

  8. Regulatory Review of theIFR Regulations • Currently, CAR 602 specifies take-offs for all Canadian aircraft as being governed by visibility only, and landings by published DH / MDAs only • Need to regulate landings as being governed by visibility as well as DH / MDAs

  9. Future Changes to IFR Regulations • Development of IFR Regulatory Review Project, with “gate to gate” philosophy • Project underway - presentation to the CARAC Technical Committee anticipated at Spring 2012 meeting

  10. Change to Airport Certification Criteria • Problem: term “Scheduled Service” in CARs Part VII (e.g., scheduled C150 versus charter B757) • Solution: remove “scheduled service” from Part III and determine another criteria for certification • Issue Paper presented and accepted by Civil Aviation Regulatory Committee (CARC) • Next step: Initiation of the review 2011/12

  11. Land and Hold Short Operations (LAHSO) • NPA presented at the November 2010 CARAC meeting updating TP 143 Aircraft Designators (e.g. Stop Group Categories and airline designators) • ICAO Air Navigation Commission (ANC) decision on LAHSO • Announcement at 2009 CARAC Plenary to harmonize with U.S. LAHSO

  12. RESA • Presented to CARAC in November 2010 • Stakeholder comments presented to CARC January 2011 • Cost Benefit analysis conducted and presented to CARC March 2011 • NPA to be re-tabled at September 2011 CARAC

  13. Advisory Circulars (2010/11) • Gravel Runways (California Bearing Ratio) • Designation of International Airports • Maintenance of Visual Aids • Photometric Measurements of Visual Aids • PAPI / ILS Harmonization • Aerodrome Aeronautical Information • Ice Aerodrome Development

  14. Advisory Circulars (continued) • Use of Engineered Material Arrestor Systems (RESA) • Winter Maintenance • Procedures for the Development and Submission of ICAO Type A Charts • Aerodrome Registration Process • Runway Incursions (TSB Watch List) • Aerodrome Operating Visibility 602.002

  15. Questions?

More Related