An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Artificial Rockwork Specialist MYOUNG-SAN

  2. CAPABILITY • Established in 1979 • Specialized in Design & Construction • of Landscape Facilities, Artificial Rock Products • Certification: ISO 9001:2000 / ISO 10041:2004 / Innovative Biz Class A / • Exclusive R&D Biz

  3. CAPABILITY • Patents on Artificial Rock • No. 10-0743816 : Artificial Rock Panel Structure Combining & Combining Method • No.10-0796241: Artificial Rock Construction Method • No.10-0877977: Artificial Garden Rock & Manufacturing Method • No.10-0943672: Manufacturing Method for Artificial Rock with Cracks • No.10-1018566: Manufacturing Method for Artificial Rock with Durability • No.20-0368973: Artificial Rock

  4. TRACK RECORD Yeoju Sky Valley C.C. 1998 Incheon International Airport 2001 Rex Field C.C. 2001 Jecheon Uirim-Reservoir 2004 Shinlim Humansia Apartment 2006 Gapyeong Benest Golf Club 2003

  5. TRACK RECORD Pangyo Cullinan Housing 2007 Mudeungsan 2007 Songdo Jack Nicklaus C.C. 2008 Gwangmyeong, Speeddom bicycle race park 2011 CJ Nine Bridge C.C. 2008 Sungbok Hillstate Apartment 2010

  6. TRACK RECORD Ara Waterway, Gulpo 2012 Ulsan, Posco The sharp apartment 2013 Sunchen, Garden exhibition. 2013 Kimhae, Lotte waterpark 2014 Kimhae, Lotte waterpark 2014 Inchen, Asian sports complex, 2014

  7. TRACK RECORD

  8. CONSTRUCTION • Manufacturing Method for Durable Artificial Rock • - Beautification work of retaining wall or concrete structure • - Special construction process to prevent cracks and corrosion during installation Special Painting on top of Concrete Rock (5~6 times) Steel Angle Retaining Concrete Wall or Structural Steel Reinforcing Steel Bar Steel Cage Concrete Primer Concrete Finish Spray <Domestic Patent No. 10-1018566>

  9. CONSTRUCTION • Artificial Rock Planter Construction • - Provision of rock planter for better natural look • - Also easily used for installing other equipment if required Artificial Rock Concrete Spray Reinforcing Steel Bar Soil Stiffener Structural Steel 10, 10a : Artificial Rock Surface 11 : Planter (Concrete Pot) 220, 410, P : Drainage 50 : Soil Drainage In Situ Construction Precast Panel Construction

  10. CONSTRUCTION • Artificial Rock Construction Process 1. Fabrication of Steel Cage 2. Anchoring of Support Structure 3. Installation of Steel Cage

  11. CONSTRUCTION • Artificial Rock Construction Process 4. Scaffolding on Site 5. Primer Concrete Spray Coat 6. Finish Spray Coat & Sculpturing

  12. CONSTRUCTION • Artificial Rock Construction Process 7. Art-Painting 8. Site Clean up

  13. CONSTRUCTION • Texture & Color (nature-type) : Naturally exposed forms brown, dark brown, red : Naturally exposed granite forms light brown, red : Old worn-out forms (faceted) brown, dark brown, blue : Partial moss-grown forms dark brown, red : Old worn-out forms (rounded) brown, dark brown : Partial moss-grown forms dark brown, red

  14. CONSTRUCTION • Texture & Color (artificiality-type) : castle wall forms bright brown : semi-indeterminate form : masonry forms brown, dark brown, grey : indeterminate form

  15. CASE STUDY _Ara Waterway, Gulpo • Progress of construction process 1 2 3 4 5 1.Situation before Initial work 2. Steel-frame structure 3. Installation of Steel Cage 4,5. Set up a scaffold * The waterfall contains the largest artificial work of Domestic records

  16. CASE STUDY _Ara Waterway, Gulpo • Progress of construction process 6 7 8 9 10 6,7. Sprayed a rough shotcrete 8. Facing a complete shotcrete 9. Painting structure 10. Create a plant pot

  17. CASE STUDY _Ara Waterway, Gulpo • Structural cross section 1 2 3 ① ③ Vertical Section ∙Perspective view ②

  18. CASE STUDY _Ara Waterway, Gulpo • Completion image Test Run of Water Fall