Integration of Renewables. ….Catalyst for change. Power Grid Corporation of India Ltd. Presentation Flow. Overview Renewable Integration Transmission Challenges & Technologies Way Forward. Overview. Indian Power Scenario. Total Installed Capacity – 304.7 GW. Peak Demand met: 148 GW.
E N D
Integration of Renewables ….Catalyst for change Power Grid Corporation of India Ltd
Presentation Flow • Overview • Renewable Integration • Transmission Challenges & Technologies • Way Forward
Indian Power Scenario Total Installed Capacity – 304.7 GW Peak Demand met: 148 GW Renewable: 44.2 GW Type Wise Capacity As on 31-07-2016 Source: Perspective Transmission Plan for 2022-36 Annual Consumption 1100 BU Power Market 9-10%
Indian Power System : Transmission Indian Power System : Transmission • 765 kV Backbone Network: • 25,647 ckm • 147000 MVA • HVDC (±500kV, ±800 kV) • 12938 ckm • 15000 MW • 400 kV : • 150021 ckm • 216282 MVA • Inter-regional Capacity: 61150 MW
National Grid – Present and Envisaged NR NER SR Present IR Capacity: 61,150 MW Existing Planned IR Capacity by XII Plan end: 78,050 MW Envisaged (Cumulative) by Mar’17 6,000 MW 22,530MW 16,920MW 2,860MW 19,530MW 12,920MW 2,860MW 12,790 MW ER WR 16,990 MW 7,920 MW 3,630MW 7,920 MW 7,830MW Present & Targeted IR Capacity include Pvt. Sector lines also • Figures do not include 600MW (in aggregate) pertaining to various 132kV
Renewable Addition Plan RE Penetration
Renewable Integration - Challenges • Issues • Short Gestation period (9-12 months) • Variability & Intermittency • Low Utilisation Factor
Green Energy Corridor-I Green Energy Corridors-Inter State Transmission • Green energy corridor to facilitate Grid integration of large scale renewables • About 33GW capacity addition envisaged through wind & solar in next 4-5 years • The Plan includes • Transmission Strengthening(s) –Intra & Inter • Dynamic reactive compensation • Energy Storage • Smart grid applications • Establishment of Renewable Energy Management Centre enabling forecasting of renewable generation, real time monitoring, etc.
Envisaged Solar Parks Locations of Solar parks Total-20 GW
800 kV HVDC 765 kV D/C
WAMS • PHASE I • Installation of 1186 PMUs along with 32 PDCs at control centers • 416 Nos. PMUs already installed • Development of Analytics etc. • PHASE II • Installation 550 PMUs, 11000 km OPGW along with associated terminal equipment etc.
URTDSM System Hierarchy Remote Consoles at CEA (1) PDC at NLDC PDC at Back up NLDC Remote Consoles at RPC (5), UT(3), States(5) Super PDCs at five RLDCs Master PDCs at SLDCs PMUs located at State Sector Substations PMUs located at IPPs across the Grid PMUs located at Central Sector Substations Router Router Router PMU- n PMU- n PMU- n PMU -1 PMU -1 PMU -1
POWERGRID’s Pilot Project for Battery Energy Storage System Applications Frequency Regulation, Energy Time Shift