150 likes | 298 Views
Joondalup Staff Lounge Presentation . Proposal. Convert 8.201 (Existing Staff Room) to a dedicated Staff Development Facility. Develop 9.207 (Vacant Cafeteria) into a Staff Lounge . PROJECT DRIVERS.
E N D
Proposal Convert 8.201 (Existing Staff Room) to a dedicated Staff Development Facility. Develop 9.207 (Vacant Cafeteria) into a Staff Lounge.
PROJECT DRIVERS • Staff Development is a key priority for the University and currently there is no dedicated/specialized space to serve this need. • An opportunity exists to create an integrated staff lounge within a food & beverage precinct in Building 9.
Rationale for locating Staff Development in B 8 • The size of this space meets the requirements of a specialized staff development facility • Open plan layout makes conversion cost effective • The size of the existing staff lounge exceeds demand requirements (284m2 with seating for 100) – Inefficient use of space
Rationale for locating Staff Lounge in B 9 Building 9 is a prime location for the staff lounge The size of the proposed space is fit for purpose Capitalizes on existing food & beverage infrastructure Opportunity to develop an integrated retreat / congregation space for ECU staff
Design Brief – New Staff Lounge • Contemporary design & fit out • Access controlled entry doors for enhanced security/privacy • A range of different seating and gathering configurations • Defined seating space on the veranda • Audio Visual • Potential for retail point at a later stage
Design Brief – New Staff Lounge • Disabled access including appliances • Capitalize on outlook to lake & pines • Layout to provide for private spaces • Seating capacity to meet demand • Staff only access to surrounding facilities • Self catering facilities (Fridges, Microwaves etc) • Security • Fit out specification to be of a high level • Flexibility of configuration
Concept Sketches 144m2 with internal seating for approximately 70 & external seating for 16
Staff Lounge Layout Lowered Ceilings Servery Access Control to Tavern Lounge Configuration Tables & Chairs
Next Steps Consultation Proposed Time Frames