30 likes | 108 Views
BGC WG Plans (short term) (2005-2006). Emphasis on coupled carbon work CSM1.0—coupled carbon cycle done OCMIP’, CASA’ (Fung, Doney et al.) CCSM3.0—coupled carbon cycle (T31 x3) C4MIP-Phase I (land/atmos hist future) CLM-CN (Thornton) spin up done CASA’ (Fung/Hoffman) spin up started
E N D
BGC WG Plans (short term)(2005-2006) • Emphasis on coupled carbon work • CSM1.0—coupled carbon cycledone • OCMIP’, CASA’ (Fung, Doney et al.) • CCSM3.0—coupled carbon cycle (T31 x3) • C4MIP-Phase I (land/atmos histfuture) • CLM-CN (Thornton) spin up done • CASA’ (Fung/Hoffman) spin up started • Phase II: (land/ocean/atmos) • OCMIP’, CASA’ (Fung, Hoffmann, Doney) • Ocean ecosystem, CLM-CN (Thornton,Doney, Moore)
BGC WG (2006-2009) • Goal of WG meetings: • Help decide which carbon scenarios will be in next IPCC through lobbying • Make sure we are set up to do them • Try to analyze runs to be sure that basic ‘physics’ is correct • CCSM3—add on dust/iron (need computer time) • CCSM3—add on reactive nitrogen (need FV) • CCSM3—add on all aerosols to include climate feedback • (more ideas in BGC-white paper) • INCITE? T85 versions of CCSM3 simulations
Problems: • Computer time • Software engineering help • PI limitations (developing state of the art codes, analyzing)