40 likes | 47 Views
Plans at USAM/CNMCA. Massimo FERRI 9th COSMO General Meeting. VISION Need to develop probabilistic forecast-system for the short term and (if affordable) the very short term forecast range.
E N D
Plans at USAM/CNMCA Massimo FERRI 9th COSMO General Meeting
VISION • Need to develop probabilistic forecast-system for the short term and (if affordable) the very short term forecast range. • Need to continue the development of models capable to properly resolve and initiate the convective scale motions to be implemented operationally in the very short term forecast range. • The unified approach to the problems of data assimilation and probabilistic forecast should be pursued.
2011 Model Deterministic Probabilistic Data assimilation Physics Ext. Short Range Use of ECMWF products - - - - Short Range COSMO-ME & HRM (probabilistic) 7 km/50 levels (14 km./50 levels) 20 members (HRM) Hybrid 3d-var + ETKF Very Short Range Relocatable & on demand COSMO-xx 2.8 km/60 levels - Nudging UTCS MID-TERM PLANS
Exploitation of COSMO Model • Implementation of a Mediterranean Wave Model driven by COSMO-ME • In the framework of HSAF it will be implemented the RTOVS 8 package in order to simulate AMSU and MW sensors.