SRP Kyrene 525/230KV 411MVA Single Phase Auto 50504 . Delivery 11/19/2010. Receipt inspection started. The unit has been cut loose from the car and is ready for off loading. Final checks on alignment of the Gantry.
E N D
SRP Kyrene 525/230KV 411MVA Single Phase Auto 50504 Delivery 11/19/2010
The unit has been cut loose from the car and is ready for off loading
4 Legged Gantry Crane is assembled and we are ready to move the unit under the lifting device
All went as planned- 50504 is upright and on the transporter
Moving the unit to the staging area, to be placed in the Substation