1 / 10

The Earth Affecting Solar Causes Observatory (EASCO)

The Earth Affecting Solar Causes Observatory (EASCO). Nat Gopalswamy for the EASCO Team*. *Nat Gopalswamya, Joseph M. Davilaa, Frédéric Auchèreb, Jesper Schouc, Clarence Korendiked, Albert Shiha,

rmeier
Download Presentation

The Earth Affecting Solar Causes Observatory (EASCO)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Earth Affecting Solar Causes Observatory (EASCO) Nat Gopalswamy for the EASCO Team* *Nat Gopalswamya, Joseph M. Davilaa, Frédéric Auchèreb, Jesper Schouc, Clarence Korendiked, Albert Shiha, Janet C. Johnstone, Robert J. MacDowalla, Milan Maksimovicf, Edward Sittlera, Adam Szaboa, Richard Wesenberga, Suzanne Vennerstromg, and Bernd Heberh L5 consortium Meeting London May 11-14, 2015

  2. Earth Affecting Solar Causes

  3. Science Payload SR: Spatial Resolution; TR: temporal Resolution

  4. EASCO Mission Requirements

  5. EASCO Payload Accommodation Taurus II with enhanced fairing Cruise Phase Configuration 13.71 m2

  6. Flight Dynamics Summary

  7. EASCO Systems Engineering Summary

  8. Ground System MGA (1/2 AU) 825 bps X-band telemetry 2 kbps X-band command HGA (L5) 363 kbps Ka Band 80 kbps X-band telemetry 2kbps X-band command SW Beacon 500 bps X Band Omni-max range 22 bps X-band telemetry 10bps X-band command 9 m SWB 34 m DSN Science & House-keeping <number>

  9. Mission Cost Estimate Summary (4/2011) Cost estimate has the level of fidelity in accordance with a five day study 15-30% cost contingencies assumed. Maybe up to 50% for lower TRL

  10. EASCO MDL Study Summary

More Related