METRICS. WHY DO WE NEED METRICS?. • to measure our progress in satisfying our system development/evolution goals. HOW DO WE COLLECT (GET, GATHER) METRICS?. • based on documented evidence of what has or is transpiring in system development/evolution. HOW DO WE USE METRICS?.
E N D
METRICS WHY DO WE NEED METRICS? • to measure our progress in satisfying our system development/evolution goals HOW DO WE COLLECT (GET, GATHER) METRICS? • based on documented evidence of what has or is transpiring in system development/evolution HOW DO WE USE METRICS? • to improve our processes from prescriptive (predictive), descriptive ("experience-base" building), and proscriptive (defect avoidance) perspectives.
IMPORTANT ASPECTS OF METRICS INMANAGING QUALITY • In the SEI Maturity Model the primary difference between Level 5 (optimized processes) and lower levels are that tests are conducted during the process and not at the end. • Both the V-System Development Model and the Spiral Model support planned testing and continuous verification and validation. So do certain well-defined, well-control approaches to prototyping. • While project management tools (e.g., MS Project, Autoplan) are useful in assisting the project manager, they can not be viewed as the only tools. Why? • For system testing, experience indicates that the best indicators focus on defect discovery and tracking.
Deciding on Software Metrics BASED HEAVILY ON ROBERT GRADY'S BOOK “Practical Software Metrics for Project Management and Process Improvement” • What are the goals in developing successful software systems? • We wish to develop systems that .... meet customer needs are reliable (perform well) are cost effective to build and evolve Meet a a customer’s desired schedule.
SG1.1 Subgoal1.2 SG1.3 SGn.1 Subgoaln.2 SGn.3 Q1.2.1 Question1.2.2 Q1.2.3 Qn.2.1 Questionn.2.2 Qn.2.3 M1.2.2.1 Metric1.2.2.2 M1.2.2.3 Mn.2.2.1 Metricn.2.2.2 Mn.2.2.3 GOAL/QUESTION/METRICPARADIGM A GOAL ELABORATION PROCESS DUE TO BASILI, ET AL AT UNIV. OF MARYLAND (SEL PROJECT) Goaln • • • • Goal1 • • • • • • • • • • • •
GOAL: Develop Successful Software Systems SG1: Maximize Customer Satisfaction SG4: Minimize Schedule SG3: Minimize Defects SG2: Minimize Engineering Effort and Schedule GOAL DEVELOPMENT
SG1: Maximize Customer Satisfaction QUESTION GENERATION Q1: What are the attributes of customer satisfaction? Q2: What are the key indicators of customer satisfaction? Q3: What aspects result in customer satisfaction? Q4: How satisfied are the customers? Q5: How do we compare with the competition? Q6: How many problems are affecting customers? Q7: How long does it take to fix a problem? (compared to customer expectn) Q8: How does installing a fix affect the customer? Q9: How many customers are affected by the problem? (by how much?) Q10: Where are the bottlenecks?
Feature Set Capabilities Generality Security Consistency Documentation Human Factors Aesthetics Failure Freq. Failure Severity Recoverability Predictability Accuracy Mean Time to Fail Speed Efficiency Thruput Resource Consumpt. Response Time Testability Extensibility Adaptability Maintainability Compatiability Configurability Serviceability Installability Localizability Q1: What are the attributes of customer satisfaction? Functionality Usability Reliability Performance Supportability
Q2-Q5: Sources of Customer Needs • Surveys Define survey goals => questions (at least one per FURPS) => how data will be analyzedand results presented.. State or graph sample conclusions. Test the survey and your data analysis before sending out Ask questions requiring simple answers, preferably quantitative or yes/no Keep it short (one to two pages) Make them very easy to return • Interviews Generally more accurate and informative, buttime-consuming and could be subject to bias.
MAJOR SW STRATEGIES MAJOR SW STRATEGIES BASED HEAVILY ON ROBERT GRADY'S BOOK “Practical Software Metrics for Project Management and Process Improvement” • What are the goals in developing successful software systems? • We wish to develop systems that .... meet customer needs are reliable (perform well) are cost effective to build and evolve
SG1.1 Subgoal1.2 SG1.3 SGn.1 Subgoaln.2 SGn.3 Q1.2.1 Question1.2.2 Q1.2.3 Qn.2.1 Questionn.2.2 Qn.2.3 M1.2.2.1 Metric1.2.2.2 M1.2.2.3 Mn.2.2.1 Metricn.2.2.2 Mn.2.2.3 GOAL/QUESTION/METRIC GOAL/QUESTION/METRICPARADIGM PARIDIGM A GOAL ELABORATION PROCESS DUE TO BASILI, ET AL AT UNIV. OF MARYLAND (SEL PROJECT) Goaln • • • • Goal1 • • • • • • • • • • • •
GOAL: Develop Successful Software Systems SG1: Maximize Customer Satisfaction SG3: Minimize Defects SG2: Minimize Engineering Effort and Schedule GOAL DEVELOPMENT GOAL DEVELOPMENT
SG1: Maximize Customer Satisfaction QUESTION GENERATION Q1: What are the attributes of customer satisfaction? Q2: What are the key indicators of customer satisfaction? Q3: What aspects result in customer satisfaction? Q4: How satisfied are the customers? Q5: How do we compare with the competition? Q6: How many problems are affecting customers? Q7: How long does it take to fix a problem? (compared to customer expectn) Q8: How does installing a fix affect the customer? Q9: How many customers are affected by the problem? (by how much?) Q10: Where are the bottlenecks?
Feature Set Capabilities Generality Security Consistency Documentation Human Factors Aesthetics Failure Freq. Failure Severity Recoverability Predictability Accuracy Mean Time to Fail Speed Efficiency Thruput Resource Consumpt. Response Time Testability Extensibility Adaptability Maintainability Compatiability Configurability Serviceability Installability Localizability Q1: What are the attributes of customer satisfaction? Functionality Usability Reliability Performance Supportability
Q2-Q5: Sources of Customer Needs • Surveys Define survey goals => questions (at least one per FURPS) => how data will be analyzedand results presented.. State or graph sample conclusions. Test the survey and your data analysis before sending out Ask questions requiring simple answers, preferably quantitative or yes/no Keep it short (one to two pages) Make them very easy to return • Interviews Generally more accurate and informative, buttime-consuming and could be subject to bias.
MEASUREMENT PROGRAMPLANNING FURPS WEEK FURPS+planned versus actual tracking (from Fig. 4-3 Grady, Practical Software Metrics)
Q6: How many problems are affecting customers? EXAMPLE METRICS: • Incomingdefect rate • Open critical and serious defects • Break/fix ratio • Post release defect density
3Q85 CRITICAL/SERIOUS PROBLEMSTRACKING
WEEK DEFECT CLOSURE:REPORTING & ANALYSIS
Ideal Defects Identified Identified Defects Total Defects 400 300 Release Date 200 100 0 0 2 4 6 8 10 12 Weeks DEFECT IDENTIFICATION & TRACKING Defects Remaining Open (based on Fig. 7-5 Defects identified/remaining open)
Defects – Cumulative % % of defects found Defects – Cumulative % by intervals 100 80 60 50% 40 25% 20% 20 4% 1% 0 2 5 10 20 hours/defect 50 PREDICTIVE MODELS Kohoutek's model
RELEASECRITERIA TESTING STANDARDS SHOULD INCLUDE AGREED-TO GOALS BASED ON THE FOLLOWING CRITERIA • breadth – testing coverage of user-accessible and internal functions • depth – branch coverage testing • reliability – continuous hours of operation under stress; measured ability to cover gracefully • defect density – (actual and/or predicted) at release
RELEASE DATES(BASED ON DEFECTS) # of Defects Target Critical Defects Critical/Serious Defects # of Defects Defect/ KNCSS Projected Release Date 10 .06 8 Actual Release Date 6 .04 4 .02 2 .00 0 Ma Ju Jl Au Se Oc No Months (based on Fig. 7-8 Critical/serious defects)
POST-RELEASE DEFECTS &CUSTOMER SATISFACTION Service Req. per KNCSS Avg. of Certified Not Certified or Did not Meet Certification Worst Certified Product 6 5 4 3 months moving average 3 2 1 0 Months 0 2 4 6 8 10 12 (based on Fig. 7-9 Postrelease incoming SR's - service requests)
METRICS SELECTION Goal1 • GOAL ELABORATION PROCESS • In reality, we seldom develop a new metric from scratch – we usually adopt an existing one. • examine "Bang" and "function point" approaches to be applied at the requirements analysis phase • we have examined fan-in/fan-out and Henry & Kafura's INF (Info Flow Measure) at the design stage • examine McCabe's cyclomatic complexity measure for intra- module complexity (applies at both the implementation and testing phases) SG1.1 Subgoal1.2 SG1.3 Q1.2.1 Question1.2.2 Q1.2.3 M1.2.2.1 Metric1.2.2.2 M1.2.2.3 Known "Metric's Base"
Decision Code block 4 10 5 4 2 5 1 1 2 6 6 7 3 7 9 CC = # of regions CC = # + 1 CC = # of independent basis paths 8 3 8 9 McCABE'S CYCLOMATIC COMPLEXITY • Programs are viewed as directed graphs that show control flow.
PROBLEMS WITH McCABE CC • It was primarily designed for FORTRAN -- doesn't apply so well with newer languages that are less procedural and/or more dynamic in nature. (E.g., how is exception handling dealt with.) • The case of CC(G) = 1 remains true for any size of linear code. • Insensitivity of CC to the software structure. Several researchers have demonstrated that CC can increase when applying generally accepted techniques to improve program structure. Evangelist['83] shows that only 2 out of 26 of Kernighan & Plauger's rules results in decreases to CC. • All decisions have a uniform weight regardless of the depth of nesting or relationship with other decisions. • Empirical studies show a mixture of successwith using McCabe's CC. • Best suited for test coverage analysis and intra-module complexity