1 / 24

Aluminium

Aluminium. Available in 1000mm wide Available in Standard and Bold Profile Silver or Off-white Bonded colour Lightweight Suitable for use in Swimming pools. Steel. Available in 940mm width Available in Bold Profile Zincalume or Off-white Bonded colour Superior Strength

Download Presentation

Aluminium

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aluminium • Available in 1000mm wide • Available in Standard and Bold Profile • Silver or Off-white Bonded colour • Lightweight • Suitable for use in Swimming pools

  2. Steel • Available in 940mm width • Available in Bold Profile • Zincalume or Off-white Bonded colour • Superior Strength • Commonly used in Gymnasiums and Multi Purpose halls where impact is possible.

  3. Foil Supplied in Rolls Foil supplied in Rolls up to 25lm in Aluminium Foil supplied in Rolls up to 15lm in Steel

  4. Foil Packaging Sampal Pallet Foil Box Export Sampal Pallet Box

  5. Support Bar Packaging Renhurst FasTrack Support Bar Packaged 4 lm

  6. Set Out • First determine Ceiling Layout • Material width 1000mm (940mm Steel) • Support Bar centers at 1005mm (945mm Steel)

  7. Ceiling Set out

  8. Set Out – Example 1

  9. Set Out – Example 2 These set outs are examples only. Ceiling can be installed to meet Architects or Clients requirements.

  10. End Wall Angle • Determine Ceiling Height. • Fix 20 x 20mm Aluminum angle to end walls

  11. Starter Bar • Attach Starter Bar to Support Bar • Use Aluminum Pop Rivets

  12. Position Support Bar • Fix Support Bar to suspension clips • Insert Support Bar Joiners • Fix with Pop Rivet • Close Suspension clip tab

  13. Renhurst have a fixing clip to suit all applications

  14. Close Support Bar Clip

  15. Support Bar Joiner

  16. Support Bar Detail • Starter Bar supplied 300mm long including all components • Can be used in any position • Can be supplied in various lengths

  17. Prepare Foil • Determine length of material required • Cut to length using sharp knife • Ensure cut is made on the high side of the corrugation

  18. Non Standard Width • Determine width required. • Roll Foil out onto a suitable Bench. • Cut Foil using a high speed electric circular saw with an Aluminum cutting blade.

  19. Lubricate Support Bar

  20. Feed Foil into Support Bar

  21. Feed Foil into Support Bar

  22. Gently Pull Foil into Lubricated Support Bar.

  23. Finishing off your ceiling • Clip bottom section of starter bar into position

More Related