An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTEROP WP10: Training activities by e-learning Raúl Poler

  2. Contents • WP10 Working Plan • Task Assignment • Workpackage Monitoring • Connection with other WPs • Next meetings

  3. Synergy WP10 Overview Document Repository Glossary PhD Program Web courses WP10 Master Program Tutorials

  4. Tasks • Task 10.1. Preparation and dissemination of a Glossary on Enterprise Modelling, Architecture & Platform and Ontologies. • Task 10.2. To create a virtual Library of papers about interoperability (Interoperability Explicit Knowledge Repository-IEKR) • Task 10.3. Creation of Tutorials (interactive courses on CDROM) on Interoperability. • Task 10.4. Creation of web courses about interoperability. • Task 10.5. Coordination of the creation of a European Master on Interoperability. • Task 10.6. Coordination of the creation of a European PhD Program on Interoperability.

  5. Participants • Polytechnic University of Valencia (Leader) • GRAISOFT • Université Henri Poincaré – Nancy 1 • Consiglio Nazionale delle Ricerche (CNR - IASI) • Stiftelsen for Industriell log Teknisk Forskning ved NTH - SINTEF • AIDIMA • Ecole Centrale de Lille • University degli Studi di Roma “La Sapienza” • Tilburg University • Kungl Tekniska Högskolan • University of Geneva • Free University of Bolzano-Bozen • Institute for Information Systems at the German

  6. Participants

  7. Deliverables & Milestones • Deliverables: • D 10.1 Interoperability Glossary (Month 12) • D 10.2 Interoperability Explicit Knowledge Repository-IEKR (Month 18) • Milestones: • M6 To define web sites and responsible for IEKR and courses about interoperability (Month 6) • M18 List of Universities and Institutions participating in Master and PhD Program on Interoperability (Month 18) • M18 Tutorials and web-courses on Interoperability (1st version) • M24 Creation of a European Master on Interoperability • M36 Tutorials and web-courses on Interoperability (2nd version) INTEROP portal

  8. Task 10.1. Preparation and dissemination of a Glossary • Duration: One year (M1-M12) • Based on a Web interface: • The glossary will be made up of two main parts: • Public zone: consultation of the Glossary by any external user (with search engine). • Private zone: insertion of terms in the Glossary by the partners, sending of revision requests and term approval & publication. • Classified in: • Modelling • Architectures & Platforms • Ontologies • Term fields: Done by WP2 • Date: date • Partner: text • SendToRev: checkbox • Revised: checkbox • Validated: checkbox • Score: integer • Term: text • Modelling: checkbox • Arq&Plat: checkbox • Ontology: checkbox • Definition: text • Author: text • Language: text new

  9. M7-M11 M1-M6 M12 Term Insertion Term Revision Term Approval & Publication Develop Web Environment Develop D10.1 Web Environment Task 10.1. Preparation and dissemination of a Glossary • Working method: • WP2 will develop the Web environment supporting the glossary. • WP10 will develop a manual of the Web environment in order to avoid problems with the insertion process. • INTEROP members will be the providers of terms and definitions. • Each term will be able to have more than one definition and will be assigned to a WP10 participant as reviewer. • Finally, the revised terms (after all needed modifications done in the portal) will be checked as valid in order to be published in the Public web space. • D10.1 will include all gathered terms.

  10. Task 10.1. Preparation and dissemination of a Glossary • Divided in seven formal subtasks:

  11. Task 10.1. Preparation and dissemination of a Glossary • Task 1 Planning

  12. Task 10.2. Create a virtual Library of papers (IEKR) • Duration: One year and a half (M1-M18) • Based on a Web interface (similar to the glossary): • The IEKR will be made up of two main parts: • Public zone: consultation of documents by any external user (with search engine). • Private zone: insertion of documents in the IEKR by the partners, sending of revision requests and document approval & publication. • Classified too in: • Modelling • Architectures & Platforms • Ontologies • Term fields: Done by WP2 • Partner: text • State: (full text, abstract only) • Link: hypertext • SendToRev: checkbox • Revised: checkbox • Validated: checkbox • Language: text • DocTitle: text • Modelling: checkbox • Arq&Plat: checkbox • Ontology: checkbox • Abstract: memo • Author: text • Date: date new

  13. M7-M17 M1-M6 M18 Paper Insertion Paper Revision Paper Approval & Publication Develop Web Environment Develop D10.2 Web Environment Task 10.2. Create a virtual Library of papers (IEKR) • Working method: • WP2 will develop the Web environment supporting the IEKR. • WP10 will develop a manual of the Web environment in order to avoid problems with the insertion process. • INTEROP members will be the providers of papers and links. • The IEKR will support documents in different languages. • Finally, the revised papers (after all needed modifications done in the portal) will be checked as valid in order to be published in the Public web space. • All external documents hosted or linked, must have the permission of the author. • Moreover, it should have a Search Engine to locate the desired documents.

  14. Task 10.2. Create a virtual Library of papers (IEKR) • Divided in seven formal subtasks:

  15. Task 10.2. Create a virtual Library of papers (IEKR) • Task 2 Planning

  16. Task 10.3. Creation of Tutorials (interactive courses on CD) • Duration: 36 months (M1 - M36). • Working plan: • To define: • In Kick-off will be defined the e-learning platform accordinglyto the global requirements of the project. • Tutorials types: • Generic, Specific, Trainer, Best Practices, etc. (to be defined) • Tasks: • INTEROP members will provide tutorials or courses already developed. • WP10 members will develop the contents of the required courses. • WP10 members will build the tutorials on CD. Done by WP2 Define tutorials framework (types and topics) Build tutorials on CD Gather existing tutorials or courses Check tutorials to be developed Develop contents

  17. Task 10.3. Creation of Tutorials (interactive courses on CD) • Divided in seven formal subtasks:

  18. Task 10.3. Creation of Tutorials (interactive courses on CD) • Task 3 Planning

  19. Task 10.4. Creation of web courses about interoperability • This task can be done jointly with Task 10.3. • Duration: 36 months (M1 - M36). • Working plan: • The same that Task 10.3. • Web courses types: • Generic, Specific, Trainer, Best Practices, etc. (to be defined) • Tasks: • INTEROP members will provide courses already developed. • WP10 members will develop the contents of the required courses. • WP10 members will build the Web courses on the e-learning Platform. Define Web courses framework (types and topics) Build Web courses on e-learning platform Gather existing tutorials or courses Check web courses to be developed Develop contents

  20. Task 10.4. Creation of web courses about interoperability • Divided in seven formal subtasks:

  21. Task 10.4. Creation of web courses about interoperability • Task 4 Planning

  22. Participant Un. Structure Kernel subjects Task 10.5 & Task 10.6. Coordination of the creation of a European Master and European Phd on Interoperability • Working plan: • Duration: 36 months (M1 - M36). • M24 Creation of a European Master on Interoperability • Program basis: • The participant Universities in the Master and PhD program will be only from within INTEROP Project. • European Master and PhD contents production: • Those tasks will search the maximum synergy with Task 10.4 (development of Web Courses). • All the INTEROP Universities and Research Institutions interested should provide subjects and contents. • Each WP10 participant should coordinate the production of contents of some parts of the courses.

  23. Task 10.5 & Task 10.6. Coordination of the creation of a European Master and European Phd on Interoperability • Task 10.5 divided in seven formal subtasks: new

  24. Task 10.5 & Task 10.6. Coordination of the creation of a European Master and European Phd on Interoperability • Task 5 Planning new

  25. Task 10.5 & Task 10.6. Coordination of the creation of a European Master and European Phd on Interoperability • Task 10.6 divided in seven formal subtasks: new

  26. Task 10.5 & Task 10.6. Coordination of the creation of a European Master and European Phd on Interoperability • Task 6 Planning new

  27. Task Assignment

  28. Workpackage Monitoring • UPV will make the “Macro-Monitoring” of the Workpackage based on dates. • Each member with assigned supervising tasks, will be responsible of the monitoring of the development of those tasks by other partners.

  29. WP6 WP5 Design principles for interoperability Common Enterprise Modelling Framework WP7 WP3 Generation of customized Enterprise Software Roadmap for researchers mobility WP8 WP2 Ontology based integration Technical support K Map Architectures Dissemination & Communication Services WP9 WP1 WP11 WP12 Connection with other WPs Glossary Repository Tutorials Web courses Master&PhD WP10

  30. Connection with other WPs new WP Input Contact Point WP Output Contact Point WP Member new “Contact Point” means an interlocutor of any WP10 participant with the WPi. It will be the responsible to notify to the “WP10 Task responsibles” the appearance of some relation between the Wpi and WP10. A “Contact Point” is not a document provider • Assignment Criteria: • To be WPi Leader • Effort in WPi

  31. Next Meetings • 2 WP10 meetings between now and next General Assembly (Nov 2004) • Dates: May 2004, Sept 2004 • Location: tbd • Should be linked with other WPs meetings