SCM Term Project proposal

SCM Term Project proposal. Yao Yaxian. Problems Description. City retailer. Factory. Costumer. Distribution Center. Problems Description. Assume there are three factories, each factory has a fixed capacity.

rona
Download Presentation

SCM Term Project proposal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SCM Term Project proposal Yao Yaxian

  2. Problems Description City retailer Factory Costumer Distribution Center

  3. Problems Description • Assume there are three factories, each factory has a fixed capacity. • There are several cities need the serviced by the distribute centers(DC), each DC has different capacity and inventory cost.

  4. Problems Description • How many DCs should be set up? • Each city has their own costumers, so they must have an inventory level. • The city retailers order for goods from DCs at a different time, so each DC must has an inventory level. • Minimize the total cost.

  5. To solve the problem, the following methods may be used: • Heuristics algorithm • Simulation

  6. Thank you