1 / 18

Aural Null Procedures Air Search

Aural Null Procedures Air Search. Module 9 of CASARA ELT Training Plan. Aural Null. Using aircraft communications radio. Aural Null. Procedure A. Procedure B. AURAL NULL PROCEDURE. In the event that your homer is not working, you must know Aural Null methods, “A”, and “B”.

ronia
Download Presentation

Aural Null Procedures Air Search

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aural Null ProceduresAir Search Module 9 of CASARA ELT Training Plan

  2. Aural Null Using aircraft communications radio

  3. Aural Null Procedure A Procedure B

  4. AURAL NULL PROCEDURE • In the event that your homer is not working, you must know Aural Null methods, “A”, and “B”. • The only equipment you need is: • VHF receiver • clock • map • pen

  5. Signal Reception Beware of a difference of signal reception on the nose of the search aircraft, as compared to the signal off of the tail. Signal strength may vary enough between the two so as to make the results inaccurate. If this occurs it is recommended that readings be taken off of the nose. It will mean flying out of the signal, then making a 180 degree turn and coming back on the same track. When flying back towards the signal, take your readings once the signal is heard again. Signal Faded Signal Detected

  6. When signal detected: • Descend to minimum reception altitude. • Disable squelch if possible and adjust radio volume to minimum reception.

  7. When signal detected:AURAL NULL PROCEDURE “A” • Fly a constant heading and draw a track made good on the map. • Pinpoint your position on map. • Once signal is lost, do a 180ºturn and mark the spot (A) where the signal is acquired again. • Maintain constant altitude and volume setting at all times.

  8. When signal fades out • Fly along the same track and pinpoint position of fade out (B), do another 180º. • Calculate mid-point of track made good (C). • From this mid-point plot at 90 degrees, a new desired track which extends on both sides of track made good. • Return to mid point and fly either direction to make good, the new track.

  9. When signal fades out • When signal strength fades out, plot this point on your map (D) • Reverse course, signal will build and then fade. Plot point at which signal fades (E)

  10. ELT Location • In theory, the ELT should be located at the mid point of the second track • Terrain, obstructions and aircraft wreckage can skew the points and make finding the ELT more difficult.

  11. Fly to Calculated Halfway pt. turn left or right and fly until signal fade Fly track until signal fade D Make 180 deg turn Signal faded Signal Detected Mark Position B Make 180 deg turn Signal Faded Signal Detected Mark Position Calculated ELT Location Calculate Halfway pt. Mark Calculated Halfway pt. Draw Track line Draw Track line 90 deg to 1st track line C Signal Detected Signal faded Make 180 deg turn Signal Detected Mark Position E Mark Position And heading Fly to Calculated Halfway pt. A

  12. Are there any questions?

  13. AURAL NULL PROCEDURE “B” • This method has both an advantage, and disadvantage: • ADVANTAGE: It is faster than Procedure “A” • DISADVANTAGE: It requires sufficient cockpit space to adequately plot the information • Requires: • VHF receiver - pen - dividers • map - ruler - 900 triangle

  14. AURAL NULL PROCEDURE “B • Position of the aircraft is plotted as soon as the signal is heard • Continue on same heading for a short distance • Turn 900 either left or right, and proceed until the signal fades. Note this position • Turn aircraft 1800 and again plot where the signal is heard, and where it fades

  15. AURAL NULL PROCEDURE “B • Approximate position of ELT is plotted by: • drawing chord lines between each set of “signal heard” and “signal fades” positions • Drawing perpendicular bisectors of each chord • Aircraft proceeds to the point where the perpendicular bisectors intersect. • The ELT should be there

  16. Are there any questions?

  17. That’s All For Now Have a pleasant flight!

  18. “THAT OTHERS MAY LIVE” CASARA THANK YOU

More Related