1 / 6

Context-Sensitive Design Criteria Implementation

SR 519 Intermodal Access Project Phase 2: South Atlantic Corridor. Context-Sensitive Design Criteria Implementation. 2 April 2009. East Plaza. Previous Plan. Revised Plan. East Plaza Revised Plan. East Plaza. Seat Walls and Railings. East Plaza. Planting. East Plaza. Planting.

ronli
Download Presentation

Context-Sensitive Design Criteria Implementation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SR 519 Intermodal Access Project Phase 2: South Atlantic Corridor Context-Sensitive Design CriteriaImplementation 2 April 2009

  2. East Plaza Previous Plan Revised Plan

  3. East Plaza Revised Plan

  4. East Plaza Seat Walls and Railings

  5. East Plaza Planting

  6. East Plaza Planting

More Related