60 likes | 194 Views
SR 519 Intermodal Access Project Phase 2: South Atlantic Corridor. Context-Sensitive Design Criteria Implementation. 2 April 2009. East Plaza. Previous Plan. Revised Plan. East Plaza Revised Plan. East Plaza. Seat Walls and Railings. East Plaza. Planting. East Plaza. Planting.
E N D
SR 519 Intermodal Access Project Phase 2: South Atlantic Corridor Context-Sensitive Design CriteriaImplementation 2 April 2009
East Plaza Previous Plan Revised Plan
East Plaza Seat Walls and Railings
East Plaza Planting
East Plaza Planting