80 likes | 193 Views
E-SURFMAR / VOS TAG – 8 / 30-31 March 2001 Genova , Italy bbb GR National Report – Michail Myrsilidis p.1/8. Locations. LES: Thermopylae Operator: Otesat. HNMS h eadquarters & PMO office. HCMR.
E N D
E-SURFMAR / VOS TAG – 8 / 30-31 March 2001 Genova, Italy bbb GR National Report – MichailMyrsilidis p.1/8
Locations LES: Thermopylae Operator: Otesat HNMS headquarters & PMO office HCMR E-SURFMAR / VOS TAG – 8 / 30-31 March 2001 Genova, Italy GR National Report – MichailMyrsilidis p.2/8
HNMS’s contribution to VOS • 2010: • Selected Ships: 8 (all conventional - 4 installed TurboWin) • Total number of obs through the GTS: 1.256 Belfort Marine type barometer Belfort precision barograph Screen mercury thermometers E-SURFMAR / VOS TAG – 8 / 30-31 March 2001 Genova, Italy GR National Report – MichailMyrsilidis p..3/8
GR VOS routes E-SURFMAR / VOS TAG – 8 / 30-31 March 2001 Genova, Italy GR National Report – MichailMyrsilidis p.4/8
PODEIDON buoy network Hellenic Centre of Marine Research (HCMR) ATHOS 39.96 N – 24.72 E LESVOS 39.15 N – 25.81 E SKYROS 39.11 N – 24.46 E MYKONOS 37.51 N – 25.46 E SARONIKOS 37.61 N – 21.62 E SANTORINI 36.26 N – 25.50 E D. KRITIKO 35.46 N – 24.55 E KALAMATA 36.57 N – 22.05 E ZAKYNTHOS 37.95 N – 20.61 E PYLOS 36.84 N – 21,62 E E-SURFMAR / VOS TAG – 8 / 30-31 March 2001 Genova, Italy GR National Report – MichailMyrsilidis p.5/8
Baros on Aegean Sky E-SURFMAR / VOS TAG – 8 / 30-31 March 2001 Genova, Italy GR National Report – MichailMyrsilidis p.6/8
Future plans for mitigating to automation Purchasing / installing 10 S- AWSProject anticipated in HNMS’s the 5-year network development plan.Challenge: Project should get the governmental approval E-SURFMAR / VOS TAG – 8 / 30-31 March 2001 Genova, Italy GR National Report – MichailMyrsilidis p.7/8
Thank you ! E-SURFMAR / VOS TAG – 8 / 30-31 March 2001 Genova, Italy GR National Report – MichailMyrsilidis p.8/8