10 likes | 132 Views
Test beam at GSI, 21-26 June 2010. preliminary – beam scheduling meeting on 19 April. cave C beam line HTD. beam: Nitrogen 0.8 GeV/u on a target.
E N D
Test beam at GSI, 21-26 June 2010 preliminary – beam scheduling meeting on 19 April • cave C • beam line HTD • beam: Nitrogen • 0.8 GeV/u • on a target