LSWG Day 2 September 2014 Injection and dump, including protection elements and abort gap cleaning. Jan Uythoven For the ABT group & friends. Outline. ABT equipment concerned MDs during Run 1 MD requests for Run 2. Equipment concerned. Injection Systems TI8 and TI2 Transfer Lines

Download Presentation

LSWG Day 2 September 2014 Injection and dump, including protection elements and abort gap cleaning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LSWG Day 2 September 2014Injection and dump, including protection elements and abort gap cleaning Jan Uythoven For the ABT group & friends

  2. Outline ABT equipment concerned MDs during Run 1 MD requests for Run 2 Jan Uythoven, Injection and dump

  3. Equipment concerned • Injection Systems • TI8 and TI2 Transfer Lines • Injection kickers MKI • Injection protection elements: TDI, TCLIs • Related: Injection Quality Control (IQC), beam induced heating (MKI, TDI), injection gap cleaning, BLMs injection region • Beam Dump Systems • Kickers: MKD, MKB • Protection elements: TCDQ, TCSGP • Dump lines, TDE • Related: Xternal Post Operation Check (XPOC), Abort Gap Cleaning, Abort Gap Keeper • MKA, MKQ, AC-dipole • Used for MDs, not the topic of study so far Jan Uythoven, Injection and dump

  4. MDs Run 1 • Injection studies • CERN-ATS-Note-2011-063 MD“MD on Injection Quality – Longitudinal and Transverse Parameters” • CERN-ATS-Note-2012-090 MD “Injection MD” • CERN-ATS-2013-061“SPS Scraping and LHC Transverse Tails” • ATS-Note-2011-049 MD “TI8 Shielding Studies and Angular alignment of TDI and TCDQ” • ATS-Note-2011-067 MD “Quench Margin at Injection” • ATS-Note-2011-050 MD “Injection into LHC of bunches at 25 ns spacing” • ATS-Note-2011-014 MD “Moving the recombination chambers to replace the Tertiary collimators in IR2” • IPAC14 WEPRI092 “Test and simulation results for quenches induced by fast losses on a LHC quadrupole”, concerns injection area Q6 Jan Uythoven, Injection and dump

  5. MDs Run 1 • UFO studies • CERN-ATS-Note-2012-018 MD“MD on UFOs at MKIs and MKQs” • CERN-ATS-Note-2011-065 MD “MKI UFOs at injection” Jan Uythoven, Injection and dump

  6. MDs Run 1 • Beam Dump Studies • ATS-Note-2011-067 MD “Quench Margin at Injection” • ATS-Note-2011-049 MD “TI8 Shielding Studies and Angular alignment of TDI and TCDQ” • ATS-Note-2011-128 PERF “Summary of Abort Gap cleaning tests performed at 3.5 TeV on October 7, 2011” and many similar PERF notes • CERN-ATS-Note-2010-050 PERF “Summary of Injection pre-cleaning tests performed on October 27, 2010” Jan Uythoven, Injection and dump

  7. MDs Run 2: Injection Studies • Possible topics • Stability (MKE), Steering, Injection losses • Protection set-up, especially TCDIs and TDIs • Simulation of MKIs failures and loss measurements (IPAC2014, MPPRO020) • Beam induced heating of the new TDIs • ‘Blindable’ BLMs in the injection regions and BLM thresholds • Matching monitors • Initial set-up will need to be done during the re-commissioning period including the new BETS on MSI and TDI. • There will certainly be questions arising following operation which will require dedicated study periods during the year • Exact topics and required time difficult to determine before first beams • If things go well, no special MKI UFO MDs required Jan Uythoven, Injection and dump

  8. MDs Run 2: Beam Dumping System • Abort Gap Cleaning with the transverse damper ADT • Different cleaning algorithms and hardware settings (with ADT team) • Effect of AGC on emittance and luminosity (possibly / partly parasitically in physics) • Automatic cleaning with new BSRA hardware and software (with BI team) • Population of abort gap (with RF-team) • New BPMS system for interlocking / protection of the extraction channel (together with BI team) • Again, initial set-up to be done during re-commissioning period but additional studies expected Jan Uythoven, Injection and dump

  9. MDs Run 2: Asynchronous Dumps • TCDQ – TCT retraction and losses • Dependence on losses on TCT following TCDQ / TCSG / TCT retraction. Together with collimation team • See simulations by Roderick Bruce, presented MPP 22nd August 2014. Related to ATS optics. • Loss maps and normal dumps under different conditions • Could be more efficient during initial commissioning period for measurements at top energy • TCDQ impedance, see LSWG 26/10/2012 • Effect of MKD failure mode, measurement with provoked asynchronous dump • Q4 IP6 quench level (IPAC2014, WEPRI092) • In collaboration with BLM Threshold Working Group • Initial commissioning during re-commissioning period • Also the measurement of the MKD-system rise time with beam, which determines the length of the abort gap, should be done during the initial set-up of the Abort Gap Keeper Jan Uythoven, Injection and dump

More Related