70 likes | 238 Views
CS275 Swoop Chart. Rate Readiness 4-Squares. Title: Floor Grid Assembly Aft Galley Drill Jigs. Responsible: M. Hudson Approved By: B. Kearns. G. G. GTG: . Is / Was. Description: Floor Grid Assembly Aft Galley Drill Jigs required to meet rate increases.
E N D
Title: Floor Grid Assembly Aft Galley Drill Jigs Responsible: M. Hudson Approved By: B. Kearns G G GTG: Is / Was Description: Floor Grid Assembly Aft Galley Drill Jigs required to meet rate increases. Closure Criteria: Tools (Qty 2 Each) have completed tool try out and integrated into baseline planning. Applicability: -9 -10 -8 Line no. Target : 102 Status: Reasons: Perform. Cost Maint. Produce. Rate Supplier / Partner Focal: M. Hudson / R.Rader Originating Organization: ME Anticipated Benefits: Customer:________Program__ Weight reduction:______N/A__ Labor hrs reduction:____TBD_ Cr path reduction:_____12 hr__ Project ME integrate tool into baseline planning ENOVIA Actions resubmitted with new SOW and new tools ME and Production Approved tool for design. Questions from Mesa tool designers answered TE to complete design of the last tool Preliminary Tool Try Out Complete Initiate ENOVIA M-Action Fabricate Tools to Build Plan First Two Tool Deliveries Tool Try Out Schedule
Section 47 Floor Grid Intercostals Project Owner: KyleStarck Status Date: 7/23/2012 Approved by: H. Harr G Y Is / Was • Description: Current Floor Grid Build up takes too long and is too expensive. • Floor beam backup fittings installed by vendor must be disassembled, deburr, and fay sealed in place after match drilling to intercostals. • Closure Criteria: Provide parts with full sized holes (intercostals Class 3, floor beam Class 1, requiring fastening only in CS 275 (no drilling). Fifteen (15) locations. Applicability: -9 -10 -8 Line no.: Target _LN150_; Status _LN 150 Reasons: Perform. Cost Maint. Produce. Rate Supplier / Partner Focal: BSC Originating Organization: BSC (ELR 061537) Boeing Focal: Kyle Starck Anticipated Benefits: Customer: CS 280 Weight reduction: N/A Labor hrs reduction: 69hrs Cr path reduction: 0.5 Day Schedule CCB1/CCB2 Apr. Eval. & Prel. Stress Assess. Dim. Anal. Change Package Baseline DE Plan ERB Approval & Stress Assess. CCB3 Apr. LN 150 Engr. Rel.
Duplicate Rate Tooling Description: Per the duplicate tool request signed on 04/12/2012 a complete duplicate of CS275 is required to protect for rates beyond 4 airplanes per month. Tool/Part Interface Study objective: All tools assembled/installed & approved for use by LN 104 Applicability: -9 -10 -8 Line no.: Target Assembly LN 104 Reasons: Perform. Cost Maint. Produce. Rate Supplier / Partner Focal: BSC AFT-Body Buyer: Kelly Lane Originating Organization: BSC Boeing Focal: R. Rader (Tool Engineering) Anticipated Benefits: Customer: CS275 Weight reduction: N/A Labor hrs reduction: Unknown Cr path reduction: N/A DRTR Request (62 tools total) PAX Floor Grid Assembly FAJ Slide 1 of 3
55 DJ/LJ List Slide 3 of 3