1 / 12

ARC node at IRAM F.Gueth – IRAM Grenoble

ARC node at IRAM F.Gueth – IRAM Grenoble. ALMA @ IRAM. IRAM deeply involved in ALMA construction Hardware: band 7 (280—360 GHz) development and (pre-)production receiver common optics backend samplers Software & proto-ARC: scientific software requirements (SSR) group

rozene
Download Presentation

ARC node at IRAM F.Gueth – IRAM Grenoble

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARC node at IRAMF.Gueth – IRAM Grenoble IRAM Interferometry School

  2. ALMA @ IRAM • IRAM deeply involved in ALMA construction • Hardware: • band 7 (280—360 GHz) development and (pre-)production • receiver common optics • backend samplers • Software & proto-ARC: • scientific software requirements (SSR) group • real-time telescope calibration pipeline • tests of prototype antennas IRAM Interferometry School

  3. Band 7, Lazareff et al. IRAM

  4. Band 7 noise temperature, 8 GHz IF (Maier et al. IRAM)

  5. ARC node at IRAM • IRAM partners • CNRS (France) • MPG (Germany) • IGN (Spain) • ARC node at IRAM also supported by • French community • Spain ALMA committee • IRAM open to all astronomers: 30% observing time outside partner countries, TNA RadioNet FP6 IRAM Interferometry School

  6. IRAM millimeter interferometry center • IRAM ARC node will be an activity of the IRAM millimeter interferometry center • Center is already in place • GILDAS software (CLASS, CLIC, …) • PdBI f2f user support since >10 years • mm-interferometry school series since 1998 • general expertise in mm-interferometry calibration and imaging techniques IRAM Interferometry School

  7. ARC node at IRAM • Goals of mm-interferometry expertise center: • User formation • User face-to-facesupport • Technical expertise center • Data reductionsoftware • Based on and fully open to collaborations with other groups • Several actions already started or planned IRAM Interferometry School

  8. User formation • Interferometry school series  5th school Oct. 2-6 2006, 66 participants • Long-period visits of PhD/postdocs • Formation to mm-interferometry techniques and data reduction, observations at PdBI (new access) • Can start in 2007 (new building available) • Please contact us if interested IRAM Interferometry School

  9. IRAM mm-interferometry school series • Every two years since 1998 • General introduction to mm-interferometry, PdBI data reduction, introduction to ALMA • ALMA practical session in 2008 ( Early Science) • Lectures and book available on the web

  10. User f2f support • In place at IRAM for PdBI since ~10 years • Each project has a local contact to help during the data reduction at Grenoble • Will be extended to support ALMA users • Critical for early-science  required in 2009 IRAM Interferometry School

  11. Technical Expertise • ALMA commissioning • GILDAS to be used for antenna SD holographies • New observing mode: OTF interferometry development at PdBI then ALMA (EU-FP6) • Using Jupiter satellites as mm flux calibrators: PdBI/30m project started (collab. with Paris Obs.) • ALMA imaging simulator IRAM Interferometry School

  12. Software devl’t • Software developments for ALMA: • telescope calibration pipeline • GILDAS/CLIC adapted for ALMA holographies • goal: long-term support/upgrade of ALMA software • pyGILDAS development: interoperability of the data reduction software (collab. with Bordeaux Obs.) IRAM Interferometry School

More Related