110 likes | 129 Views
Learn about energy/water projects, initiatives, challenges, and success stories in the IMCOM Sustainment Directorate. Discover the focus on resilience, sustainability, and conservation efforts to optimize energy resources. Explore the organizational structure, key projects, and future plans. Stay informed and engaged in energy efficiency strategies.
E N D
IMCOM Sustainment Directorate Mr. Karim Manji Energy Update
Subordinate Garrisons IMCOM IMCOM Sustainment • AMC SC Installations • - Adelphi • - APG • - Detroit • - Natick • - Picatinny* • - Redstone • - Rock Island • - Anniston AD** • - Bluegrass AD** • - Letterkenny AD** • - McAlester AAP** • - Pine Bluff Arsenal** • - Pueblo CD** • - Red River AD** • - Sierra AD** • - Tobyhanna AD** • - Tooele AD** • - Watervliet** • MDW SC Installations • - Ft. AP Hill • - Ft. Belvoir • - Ft. Meade • - JB Myer-Henderson Hall • MEDCOM SC Installations • - Ft. Detrick • ATEC SC Installations • - Dugway • - Yuma • SOUTHCOM SC Installations • - Miami • - Soto Cano • ARNORTH SC Installations • - ASA Ft. Sam Houston 17 Direct Report Installations + 11 AMC Special Installations (MWR only) * SC is subordinate to ASA(ALT) ** AMC Installation – ID-S over MWR only
IMCOM Sustainment Task Organized Organizational Structure Director XO CSM Deputy COS SJA EA HR IST RM MWR PW Ops/Plans • Installations: • APG - Meade • Adelphi - Natick • AP Hill - Picatinny • Belvoir - Redstone • Detroit - Rock Island • Detrick - Sam Houston • Dugway PG - Yuma PG • JB Myer HH - Soto Cano AB As of 20 Feb 2019
Energy/Water • FY 19 Energy OPORD:IMCOM HQ G4 is working (ET: March with data due April). Main change from last year: Inventory all facility emergency back-up power generators. • FY 20 Projects Submission: • EWCR – emphasize resiliency component of project • Projects with payback < 10 years are now being considered viable • Highly recommend building retuning/recommissioning projects. High payback demonstrated at RSA. • IEWPs: • FY19: Belvoir/Detrick/Meade/Redstone (kicked-off). Miami upcoming. • FY20: APG (will roll-up Adelphi with APG) • FY21: Adelphi / AP Hill /Detroit / Dugway /JBMHH / Natick / Picatinny / RIA / Natick • ID S Initiatives: • REM Acquisition • ESPC/UESC Buydowns, • Metering IDS goal at 85% Goal vs 65% for IMCOM • Building Automation Systems (BAS) • Demand Reduction (DR) • Mock Billing (for reimbursable customers – aid in paradigm shift to conserve) • Energy Policy
Energy/Utilities Approach • 1 – Situation • Under a10% Cost Redux Mandate for Energy/Utilities • Installations have briefed Achievable Reductions • 3 – Sustainability Initiatives • Building Automation Systems • Metering (Success Story: Meade – mock billing for nonreimbursible Army Customers) • Energy Policies from top-down (assist in paradigm shift) • Demand Redux Participation • Continuous Commissioning (success story: RSA) • 4 – Challenges / Resources Needed • Funding for initiatives (pursuing ESPCs/UESCs/EWCR/QUTM) • Resources (TDA cut-backs) • Need organization behavioral changes; with tangible enforcements • Need variance to allow charge-backs for above common level of services for Army Customers • Funding for Resource Efficiency Managers (REMs) • Requirement for additional upgrades to BAS; ability to off set costly demand surges; Army metering system not linked to BAS • Need organization behavioral changes; with tangible enforcement • 2 – Resilience/Security Initiatives • APG (Edgewood Site) CHP – 7.9 MW (~50% redux in consumption) • Detroit Arsenal – programming CHP 4MW • Taking a holistic approach with Installation Energy/Water Plan (IEWP). Building resiliency/security/conservation requirements into the IEWP • Following AMC approach on Resilience (load level up to transmission)
IDS Energy/Utilities Success Stories APG Edgewood Area CHP
Energy/Utilities Success Stories Redstone Arsenal Bldg. Resilience and Renewable
Energy/Utilities Success Stories Redstone Arsenal Bldg. Retuning (Bldg. 4400) (Validated EUI savings)