An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progressive Sustainment How to create a self sustaining system that continuously improves upon itself www.uttana.com

  2. The CAPD Cycle • TPM is intended to create a self sustaining system that continuously improves upon itself. • At the heart of this concept of progressive sustainment, is the CAPD cycle: • Check • Act • Plan • Do www.uttana.com

  3. Check and Act • Check: • Examine and understand the current conditions. • Root out problems such as abnormalities, and defects. • Established baselines for the measuring future improvements. • Act: • Take immediate countermeasures • Restore proper conditions. www.uttana.com

  4. Plan • Analyze the root causes of the problems • Create an outline for changes that need to be made. • This planning includes: • New work standards. • Visual controls. • Alterations or new designs for equipment and products if necessary. www.uttana.com

  5. Do • implementing the plan created in the previous step. • Close attention needs to be paid to the results. This ultimately leads right back to the first step: Check www.uttana.com

  6. Focused Improvement Activities • CAPD should be a self perpetuating system when implemented correctly. • The CAPD cycle corresponds to the different steps of TPM focused improvement activities. www.uttana.com

  7. CAPD and Activity Correlations www.uttana.com