50 likes | 148 Views
Peter Kody š + Pavel Ř ezn íč ek. Status of work in grid event production. For b-physics meeting @ May 05, 2005. Running: bphys.018900.simul+digit.Lambdab_mumu_Lambda bphys.017901.simul+digit.Bd_mu6mu4_K0star bphys.017902.simul+digit.Bs_mu6mu4_phi Problems:
E N D
Peter Kodyš + Pavel Řezníček Status of work in grid event production For b-physics meeting @ May 05, 2005 b-physics meeting 5/03, 2005, Peter Kodys
Running: • bphys.018900.simul+digit.Lambdab_mumu_Lambda • bphys.017901.simul+digit.Bd_mu6mu4_K0star • bphys.017902.simul+digit.Bs_mu6mu4_phi • Problems: • Unstable working PoolFileCatalog registration • Efficiency: • 11 - 16% submitions find source file !!! • Comment: • More than 20 000 submitions per 16 days • Only 227kEvents (2270 jobs) done • Yield ~ 11% • Problem is solving with: • Pavel, Alessandro, James • Prague Site “golias”: Jiri Chudoba, Jiri Kosina, Jan Svec Status b-physics meeting 3/21, 2005, Peter Kodys