1 / 66

Introduction SAP R

ryder
Download Presentation

Introduction SAP R

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Introduction SAP R/3 – MM Dr. Djamal Ziani King Saud University

    2. ERP-Software: SAP R/3 The SAP R/3 is mainly structured in modules: The top level are functional modules. In this slide green modules belong to Logistics. These are: SD (Sales and Distribution), MM (Material Management), PP (Production Planning and Controlling), QA (Quality Assurance), PM (Plant Maintenance). The accounting modules are red: FI (Financial Accounting), CO (Controlling, Cost Accounting), AM (Asset Management), PS (Project System). Human Resource Management is the yellow module. OC means office communication like emailing. IS stands for Industry Solutions. These are branch-specific packages (e.g. automotive, retailing, oil industry). Currently, HR is the only module which is separated from the other modulsThe SAP R/3 is mainly structured in modules: The top level are functional modules. In this slide green modules belong to Logistics. These are: SD (Sales and Distribution), MM (Material Management), PP (Production Planning and Controlling), QA (Quality Assurance), PM (Plant Maintenance). The accounting modules are red: FI (Financial Accounting), CO (Controlling, Cost Accounting), AM (Asset Management), PS (Project System). Human Resource Management is the yellow module. OC means office communication like emailing. IS stands for Industry Solutions. These are branch-specific packages (e.g. automotive, retailing, oil industry). Currently, HR is the only module which is separated from the other moduls

    3. 3 Components of Materials Management Purchasing (MM-PUR)  Purpose The R/3 System consists of a number of components that are completely integrated with one another. This integration allows the various departments and units of an enterprise to share and maintain the same information. Purchasing is a component of Materials Management (MM). The Materials Management (MM) module is fully integrated with the other modules of the SAP System. It supports all the phases of materials management: materials planning and control, purchasing, goods receiving, inventory management, and invoice verification. The tasks of the MM Purchasing component are as follows: External procurement of materials and services Determination of possible sources of supply for a requirement identified by the materials planning and control system or arising directly within a user department Monitoring of deliveries from and payments to vendors Good communication between all participants in the procurement process is necessary for Purchasing to function smoothly. Valuation MM - Material Price Change (MM-IV-MP) Balance Sheet Valuation (MM-IM-VP) Actual Costing/Material Ledger (CO-PC-ACT) Inventory Management and Physical Inventory (MM-IM)  Purpose This component deals with the following tasks: Management of material stocks on a quantity and value basis Planning, Entry, and Documentation of all Goods Movements Carrying out the Physical Inventory Features Material Master (LO-MD-MM)  Purpose The material master contains information on all the materials that a company procures or produces, stores, and sells. It is the company's central source for retrieving material-specific data. This information is stored in individual material master records. MRP Procedures in Consumption-Based Planning  Use In consumption-based planning, the following MRP procedures are available: Reorder point procedure Forecast-based planning Time-phased materials planning Logistics Invoice Verification (MM-IV-LIV)  Purpose Logistics Invoice Verification is a part of Materials Management (MM). It is situated at the end of the logistics supply chain that includes Purchasing, Inventory Management, and Invoice Verification. It is in Logistics Invoice Verification that Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting. Product Catalog A number of media can be used as vehicles for presentations, including: Print media CD-ROM Online services (such as internet, T-Online, CompuServe, AOL) Information kiosks at the point of purchase The Product Catalog functionality comprises a programming interface (Business API) for accessing the data and integrated maintenance of product catalog-related data. This data comprises: The layout of the product catalog The materials and prices in the product catalog Texts Multi-media objects (graphics, sound documents, video clips etc.). Service Master MM External Services Management provides a basic process for the procurement of externally performed services. This basic process comprises the following functionality: Foreign Trade Official customs brokers are licensed by the customs service to assist you with import and export transactions. They have the responsibility to ensure that all foreign trade customs procedures are followed completely and comply to legal regulations. They also ensure that the duties collected from your company are turned over to the government when they become due. Although the services of a customs broker replace the need for your company to handle the necessary tasks associated with foreign trade, they can be very costly. SAP's FT system incorporates all of the necessary checks and balances necessary to ensure that your import and export transactions are handled lawfully and that the duties owed to the customs authorities are calculated instantly and accurately. Purchasing (MM-PUR)  Purpose The R/3 System consists of a number of components that are completely integrated with one another. This integration allows the various departments and units of an enterprise to share and maintain the same information. Purchasing is a component of Materials Management (MM). The Materials Management (MM) module is fully integrated with the other modules of the SAP System. It supports all the phases of materials management: materials planning and control, purchasing, goods receiving, inventory management, and invoice verification. The tasks of the MM Purchasing component are as follows: External procurement of materials and services Determination of possible sources of supply for a requirement identified by the materials planning and control system or arising directly within a user department Monitoring of deliveries from and payments to vendors Good communication between all participants in the procurement process is necessary for Purchasing to function smoothly. Valuation MM - Material Price Change (MM-IV-MP) Balance Sheet Valuation (MM-IM-VP) Actual Costing/Material Ledger (CO-PC-ACT) Inventory Management and Physical Inventory (MM-IM)  Purpose This component deals with the following tasks: Management of material stocks on a quantity and value basis Planning, Entry, and Documentation of all Goods Movements Carrying out the Physical Inventory Features Material Master (LO-MD-MM)  Purpose The material master contains information on all the materials that a company procures or produces, stores, and sells. It is the company's central source for retrieving material-specific data. This information is stored in individual material master records. MRP Procedures in Consumption-Based Planning  Use In consumption-based planning, the following MRP procedures are available: Reorder point procedure Forecast-based planning Time-phased materials planning Logistics Invoice Verification (MM-IV-LIV)  Purpose Logistics Invoice Verification is a part of Materials Management (MM). It is situated at the end of the logistics supply chain that includes Purchasing, Inventory Management, and Invoice Verification. It is in Logistics Invoice Verification that Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting. Product Catalog A number of media can be used as vehicles for presentations, including: Print media CD-ROM Online services (such as internet, T-Online, CompuServe, AOL) Information kiosks at the point of purchase The Product Catalog functionality comprises a programming interface (Business API) for accessing the data and integrated maintenance of product catalog-related data. This data comprises: The layout of the product catalog The materials and prices in the product catalog Texts Multi-media objects (graphics, sound documents, video clips etc.). Service Master MM External Services Management provides a basic process for the procurement of externally performed services. This basic process comprises the following functionality: Foreign Trade Official customs brokers are licensed by the customs service to assist you with import and export transactions. They have the responsibility to ensure that all foreign trade customs procedures are followed completely and comply to legal regulations. They also ensure that the duties collected from your company are turned over to the government when they become due. Although the services of a customs broker replace the need for your company to handle the necessary tasks associated with foreign trade, they can be very costly. SAP's FT system incorporates all of the necessary checks and balances necessary to ensure that your import and export transactions are handled lawfully and that the duties owed to the customs authorities are calculated instantly and accurately.

    4. 4 Organizational Data A hierarchy in which the organizational units in an enterprise are arranged according to tasks and functions Are static data and are rarely changed The definition of organization units is a fundamental step, it is a critical factor in how the company will be structured Master data does not change very often Org data – should not change Transaction data (application data) – changes every transaction If you setup organizational data and wish to change it, it very well may be more work than the initial setup. Master data does not change very often Org data – should not change Transaction data (application data) – changes every transaction If you setup organizational data and wish to change it, it very well may be more work than the initial setup.

    5. Organizational Structures

    6. 6 Organizational Structures Client Company Plant Valuation Area Storage Locations Purchasing Organizations Purchasing Groups There are five organizational structures that we will define for our material management Plant Valuation area Storage locations Purchasing organizations Purchasing groups There are five organizational structures that we will define for our material management Plant Valuation area Storage locations Purchasing organizations Purchasing groups

    7. Organizational Structures: Client The client is a unit within an SAP R/3 system that is self-contained both in legal and organizational terms and in terms of data, with separate master records and an independent set of tables. From a business viewpoint, the client represents a corporate group, for example. Client: 3 numerical digits

    8. Organizational Structures: Company The company is the smallest organizational unit of external accounting for which a complete, self-contained bookkeeping system can be replicated. A company code represents an independent unit producing its own balance sheet, for example, a company within a corporate group (client). Company code = 4 characters

    9. 9 Organizational Structures: Plant Lowest valuation area Organizational level where Material Requirements (MRP) runs Generally used to describe a production site, a distribution center or centralized warehouse May be a physical or logical unit Plant is a physical or logical location It may be a warehouse: PHYSICAL Vendor are in warehouse (Vendor managed inventory) Customer site (consigned inventory): LOGICAL Can do multiple plants within the same physical structure We value material at the plant level. Planning done at the plant not organizational level The plant is an operating area or branch within a company. The plant is embedded in the organizational structure as follows: The plant is assigned to a single company code. A company code can have several plants. Several storage locations in which material stocks are managed can belong to a plant. A single business area is assigned to a plant and to a division. A plant can be assigned to several combinations of sales organization and distribution channel. A plant can have several shipping points. A shipping point can be assigned to several plants. A plant can be defined as a maintenance planning plant. A plant has the following attributes: A plant has an address. A plant has a language. A plant belongs to a country. A plant has its own material master data. You can maintain data at plant level for the following views on a material master record in particular: MRP, Purchasing, Storage, Work scheduling, Production resources/tools, Forecasting, Quality management, Sales, Costing. The plant plays an important role in the following areas: material valuation If the valuation level is the plant, the material stocks are valuated at plant level. If the valuation level is the plant, you can define the material prices for each plant. Each plant can have its own account determination. inventory management The material stocks are managed within a plant. MRP Material requirements are planned for each plant. Each plant has its own MRP data. Analyses for materials planning can be made across plants. production costing In costing, valuation prices are defined only within a plant. plant maintenance If a plant performs plant maintenance planning tasks, it is defined as a maintenance planning plant. A maintenance planning plant can also carry out planning tasks for other plants (maintenance plants). Plant is a physical or logical location It may be a warehouse: PHYSICAL Vendor are in warehouse (Vendor managed inventory) Customer site (consigned inventory): LOGICAL Can do multiple plants within the same physical structure We value material at the plant level. Planning done at the plant not organizational level The plant is an operating area or branch within a company. The plant is embedded in the organizational structure as follows: The plant is assigned to a single company code. A company code can have several plants. Several storage locations in which material stocks are managed can belong to a plant. A single business area is assigned to a plant and to a division. A plant can be assigned to several combinations of sales organization and distribution channel. A plant can have several shipping points. A shipping point can be assigned to several plants. A plant can be defined as a maintenance planning plant. A plant has the following attributes: A plant has an address. A plant has a language. A plant belongs to a country. A plant has its own material master data. You can maintain data at plant level for the following views on a material master record in particular: MRP, Purchasing, Storage, Work scheduling, Production resources/tools, Forecasting, Quality management, Sales, Costing. The plant plays an important role in the following areas: material valuation If the valuation level is the plant, the material stocks are valuated at plant level. If the valuation level is the plant, you can define the material prices for each plant. Each plant can have its own account determination. inventory management The material stocks are managed within a plant. MRP Material requirements are planned for each plant. Each plant has its own MRP data. Analyses for materials planning can be made across plants. production costing In costing, valuation prices are defined only within a plant. plant maintenance If a plant performs plant maintenance planning tasks, it is defined as a maintenance planning plant. A maintenance planning plant can also carry out planning tasks for other plants (maintenance plants).

    10. 10 Organizational Structures: Valuation Area The valuation area determines at which level a material is valuated (inventory value is established) SAP R/3 allows valuation at the company code or plant level, but recommends valuation area be set at the plant level. Means each plant can have its own material prices and account determination We are going to create at the plant level. System defaults to plant level. Define valuation level You define the valuation level by specifying the level at which material stocks are valuated. You can valuate material stocks at the following levels: Plant level Valuation must be at this level in the following cases: If you want to use the application component Production Planning (PP) or Costing Company code level The decision you make is valid for the whole client. You are recommended setting material valuation at plant level.We are going to create at the plant level. System defaults to plant level. Define valuation level You define the valuation level by specifying the level at which material stocks are valuated. You can valuate material stocks at the following levels: Plant level Valuation must be at this level in the following cases: If you want to use the application component Production Planning (PP) or Costing Company code level The decision you make is valid for the whole client. You are recommended setting material valuation at plant level.

    11. 11 Organizational Structures: Storage Location Subdivision of a plant Where materials are managed (inventory management) Raw Materials Maintenance, Repair, and Other (MRO) Finished Product May be a physical or logical unit Maintain storage location A storage location is the place where stock is physically kept within a plant. A storage location has the following attributes: There may be one or more storage locations within a plant. A storage location has a description and at least one address. It is possible to store material data specific to a storage location. Stocks are managed only on a quantity basis and not on a value basis at storage location level. Physical inventories are carried out at storage location level. A storage location can be assigned to a warehouse number in the Warehouse Management System . You can assign more than one storage location to the same warehouse number within a plant. Storage locations are always created for a plant. Could be inventory management Production floor Quality Engineering bin Maintain storage location A storage location is the place where stock is physically kept within a plant. A storage location has the following attributes: There may be one or more storage locations within a plant. A storage location has a description and at least one address. It is possible to store material data specific to a storage location. Stocks are managed only on a quantity basis and not on a value basis at storage location level. Physical inventories are carried out at storage location level. A storage location can be assigned to a warehouse number in the Warehouse Management System . You can assign more than one storage location to the same warehouse number within a plant. Storage locations are always created for a plant. Could be inventory management Production floor Quality Engineering bin

    12. Organizational Structures: Purchasing Organizations An organizational unit responsible for procuring materials or services for one or more plants and for negotiating general conditions of purchase with vendors. The purchasing organization assumes legal responsibility for all external purchase transactions.

    13. Purchasing organization here you can see how the POrg, the plants and PG‘s are linked up ? responsible, assigned tohere you can see how the POrg, the plants and PG‘s are linked up? responsible, assigned to

    14. Organizational Structures: Purchasing Organization Groups

    15. Inventory Management with a Warehouse Management System Here you can see an overview of the hierarchical structure including the objects of the warehouse management IDES = exemplary company maintained in the SAP system different Storage locations are assigned to a warehouse numberHere you can see an overview of the hierarchical structure including the objects of the warehouse management IDES = exemplary company maintained in the SAP system different Storage locations are assigned to a warehouse number

    16. The Module MM – Main Functions I will talk about the material master later before you order the material from a vendor you have to plan the quantites you need in each period next, the ... can be mentioned ? user department ... after you have received the goods, the vendor will make out an invoice and send it to you. Before paying the invoice has to be verified ? compare with PO, delivery notes etc. I will talk about the material master later before you order the material from a vendor you have to plan the quantites you need in each period next, the ... can be mentioned ? user department ... after you have received the goods, the vendor will make out an invoice and send it to you.Before paying the invoice has to be verified ? compare with PO, delivery notes etc.

    17. MM – interdependencies to other modules talking of the inter-depENdencies of MM one can say that all of the other modules regularly access data maintained and updated in the module MM like the material master for example, which is relevant for prod. planning and sales & distrib. also: requirements planning.... talking of the inter-depENdencies of MM one can say that all of the other modules regularly access data maintained and updated in the module MM like the material master for example, which is relevant for prod. planning and sales & distrib. also: requirements planning....

    18. Basic Data Master records - include information about vendors material and services to be procured the relation between 1. and 2. (purchasing info record) e.g. prices / terms and conditions bills of material for production planning purchasing sales and distribution withdrawal of Material There are two types of basic data in the module MMThere are two types of basic data in the module MM

    19. Structure of the Vendor Master Record different sectionsdifferent sections

    20. Create a Vendor

    21. Create a Vendor

    22. Create a vendor

    23. Create a Vendor

    24. Create a Vendor

    25. Create a Vendor

    26. Create a Vendor

    27. Create a Vendor

    28. Views on the Material Master Record

    29. Demo: Create Material Master

    30. Demo: Create Material Master

    31. Demo: Create Material Master

    32. Demo: Create Material Master

    33. Demo: Create Material Master

    34. Demo: Create Material Master

    35. Demo: Create Material Master

    36. Demo: Create Material Master

    37. purchasing info record so far: considered information about material vendors now: talk about information relating to the combination ERMso far: considered information about material vendors now: talk about information relating to the combination ERM

    38. Purchasing Process the process has the following main steps:the process has the following main steps:

    39. Create Purchase Order (PO) 3 possibilities of ordering material3 possibilities of ordering material

    40. Purchasing Process Create a requisition First release of requisition Create RFQ (Request for Quotation) with reference to requisition Create PO (Purchase Order) with reference to RFQ Department receives material ordered (GR) Department pays invoice (MIRO).

    41. Purchase Requisition

    42. Request for Quotation

    43. Purchase Order

    44. Create Purchase Requisition

    45. Create Purchase Requisition

    46. Create Purchase Requisition

    47. Create Purchase Requisition

    48. Demo: Create Purchase Order

    49. Demo: Create Purchase Order

    50. Demo: Create Purchase Order

    51. Demo: Create Purchase Order

    52. Posting an Order Entry (Goods Receipt)

    53. Goods Receipt: Transfer posting

    54. Demo: Posting Order Entry (Goods Received)

    55. Demo: Posting Order Entry (Goods Received)

    56. Demo: Posting Order Entry (Goods Received)

    57. Demo: Posting Order Entry (Goods Received)

    58. Demo: Posting Order Entry (Goods Received)

    59. Invoice Verification

    60. Invoice Verification

    61. Create Invoice

    62. Create Invoice (contd..)

    63. Create Invoice (contd..)

    64. Create Invoice (contd..)

    65. Demo: Invoice Verification

    66. Demo: Invoice Verification

    67. Demo: Invoice Verification

More Related