Welcome to Timberlake Presented by Charles (Charley) F. Hurt, P.E. Charles (Chuck) K. Hurt, P.E. April 19, 2004. The Headforemost Co. Consultant Engineers 408 St. Andrews Circle Lynchburg, VA 24503 (434) 384-0710. Acknowledgements & Thanks Charles Falwell, Falwell Well Corp.
E N D
Welcome to Timberlake Presented by Charles (Charley) F. Hurt, P.E. Charles (Chuck) K. Hurt, P.E. April 19, 2004 The Headforemost Co. Consultant Engineers 408 St. Andrews Circle Lynchburg, VA 24503 (434) 384-0710 Acknowledgements & Thanks Charles Falwell, Falwell Well Corp. The News & Daily Advance Hurt & Proffitt, Inc. Designed by: Betty Anne Hurt
History • Timberlake “the gem of the Piedmont” • 70 acres of lake and golf course • Developed in the fall of 1926 • Developers • The Timberlake Corp. • Edley Craighill, Engineer • F. L. Showalter, Contractor • The Dam was designed for the 100-year flood • The Timberlake Corp. took bankruptcy in 1930 • The Peaksview Corp. bought the property in 1945 • The water system was given to CCUSA in 1970 • The Homeowners Assn. (HOA) was set up in 1986 and continued until 1990
DAM FAILURE June 22, 1995 • Century’s hardest recorded Rainfall • 9” in 4 to 5 hours
Reconstruction of Timberlake • An emergency meeting of the Board of Directors of the HOA was called • Reconstruction CommitteeCharlie Falwell, Chair • Restoration FundBud Colbert, Chair • Licensing and PermitsGeorge Shrader, Chair • Land AssessmentsShaeffer Oglesby
Rebuild Dam • HOA hired Hurt & Proffitt on July11,1995, to design the reconstruction of Timberlake • Bid opening for Dam repairs - May 23, 1996 • Construction by Counts & Dobyns began onJune 2, 1996 • Clay core material was found on adjoining property of Bobby Montgomery • Hurricane Fran brought heavy rains half-way through the construction • Dam completed November 1, 1996 • Refilling of Lake on February 17, 1997 • Easter Sunday 1997, after 40 days and 40 nights FULL LAKE water flowed thru the primary spillway
Construction of New DamJune 1996 Cutting a Keyway to the Dam
200 ft. wide by 4.5 ft. deep Construction of Emergency Spillway
Good Bye from Timberlake Presented by Charles (Charley) F. Hurt, P.E. Charles (Chuck) K. Hurt, P.E. The Headforemost Co. Consultant Engineers 408 St. Andrews Circle Lynchburg, VA 24503 (434) 384-0710 Acknowledgements & Thanks Charles Falwell, Falwell Well Corp. The News & Daily Advance Hurt & Proffitt, Inc. Designed by: Betty Anne Hurt