An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Low Altitude Balloon Experiment in Technology (LABET) Group Members – Richard George – Industrial Technology Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Advisor – Matt Nelson

  2. Project Description • The LABET project has been an ongoing project with the Space Systems and Controls Lab (SSCL) that aims at developing a blimp that can be flown for research and for outreach events for the SSCL. • Past LABETs have been designed for indoor use only. • This project aims to develop a blimp system that can be flown in outdoor conditions with winds under 10 mph. • Objective – • Develop a new LABET frame • Develop new LABET avionics

  3. Requirements

  4. Constraints and Technical Considerations • All motors, electronics, and batteries must weigh under 1.5lbs. • The motors must provide enough thrust to overcome 10 mph winds. • Obtaining a small RF device that is still able to broadcast up to 2 miles.

  5. On Board System Diagram

  6. Frame Design

  7. Balloon Design

  8. Tasks/Schedule

  9. Tasks/Schedule

  10. Risks and Mitigation

  11. Cost Estimate

  12. Questions?