An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ESSnet “Preparation of standardisation” Analysis of methodological handbooks: future work ISTAT Rome, 6-7 June 2011 Essnet STAND-PREP Rome, 6-7 June 2011

  2. Analysis of methodological handbooks • So far, six methodological handbooks have been analysed by different statistical Institutes  11 different analyses. • Then, 6 compared analysis of the different repositories for the same handbooks, have been produced (Rome meeting). • Next steps: • reconciliation • analysis of the unified repository Essnet STAND-PREP Rome, 6-7 June 2011

  3. Reconciliation (1/2) • For each handbook, the partner responsible for the compared analysis should detect • inconsistencies between the two repositories, that could regard • provisions: differences in definition and/or attributes • other objects (methodologies, methods, IT tools, etc.): differences in definitions and/or in links • non-correspondences (missing items in one repository with respect to another). • The responsible partner should list all the identified problems, and discuss them with the other partner, in order to agree on the final result, that is: • a unique repository of validated provisions and other objects, for the given handbook Essnet STAND-PREP Rome, 6-7 June 2011

  4. Reconciliation (2/2) • Example: “Survey Methods and Practice”. • The analyses has been carried out by: • ISTAT (chapters 4,5,6,7,8,10) • ONS (chapters 1,2,3,4,5) • ISTAT is the responsible for the compared analysis, and also for reconciliation. So ISTAT will provide to: • detect problems on common part (chapters 4,5), and on only-ONS part (chapters 1,2,3) • illustrate to ONS detected problems • agree a common solution • build a unique repository for “Survey Methods and Practice”. Essnet STAND-PREP Rome, 6-7 June 2011

  5. Analysis of the unified repository (1/2) • After the reconciliation step, and the unification of the different analyses for each handbook, ISTAT will provide to build a unique repository containing provisions and other objects regarding all the 6 methodological handbooks. • At this point, it will be possible to conduct an analysis by considering different starting points. For instance, the GSBPM sub-processes • sampling (Destatis ?) • data collection ( ? ) • data editing and imputation ( ? ) • … Essnet STAND-PREP Rome, 6-7 June 2011

  6. Analysis of the unified repository (2/2) • For instance, we know that some of provisions derived from “Survey Methods and Practice” regard same sub-processes than the provisions derived from “Edimbus” or “Eurostat guidelines on sampling” refer to. • It will be of interest an analysis, for a given GSBPM sub-process, of all the provisions and other objects (in particular methodologies and methods) derived by different handbooks. • This work can give hints on the process of selection and validation of methodological standards that should be carried out in a systematic way in the next years at European and international level. Essnet STAND-PREP Rome, 6-7 June 2011

  7. Time-table • Reconciliation and a unique mdb per handbook: before 30th June • Building unified repository: by 5th July • Analysis of unified repository: before 20 July Essnet STAND-PREP Rome, 6-7 June 2011