1 / 4

HBD HV Control and Monitoring System

HBD HV Control and Monitoring System. STATUS UPDATE. Manuel Proissl HBD Meeting 01/13/2009. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: January 13 th , 2009. CALIBRATION PROGRESS.

sade-brewer
Download Presentation

HBD HV Control and Monitoring System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HBD HV Controland Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/13/2009

  2. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: January 13th, 2009 CALIBRATION PROGRESS • After initial non-linearity problems (unknown current development) by using a 1GOhm divider for the L1471N calibrations, the actual divider installed on HBD is being used. VA 022 HVCV2.0 LeCroy 1458HP recording • HV Control ramps channel by channel up in a specific pattern (see next slide) • Every second the voltage reading from Fluke is being recorded 16 …… LC 1471 LC 1471 Ground HBD HV Control & Monitoring System Manuel Proissl Page 2 of 4

  3. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: January 13th, 2009 CALIBRATION PROGRESS • The system ramps every channel up from 0 – 3kV in 50V increments with a timeout of 25.3s each, and from 3 – 4kV in 10V increments with a timeout of 30.3s each. The ramp up speed is set to 10V/s. EN1 Step function as later being used for ramp ups to ST/OP 0-3kV 3-4kV HBD HV Control & Monitoring System Manuel Proissl Page 2 of 3

  4. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: January 13th, 2009 DETECTOR OPERATION • HV Control provides the hard-coded protection to prevent the user from the opportunity to destroy the detector (e.g. setting DV to 6kV). • HV Control offers various options to bring the detector up to operational mode. • Here a few questions for the group: • Do we want to operate based on GAIN (2k to 10k) and load automatically the corresponding voltages (Tom’s sheet / future modifications) into the ramp up process OR set voltages in the ramp up table directly with the GAIN in mind? • Many FB/RB tables in Run7 had same Mesh voltage… Do we want to keep this for every module variable based on key voltages? • Hard-coded limits: • Operational/Standby voltages – 4000V (?) • RUP/RDN – 500V/s • Trip Current – 200mkA HBD HV Control & Monitoring System Manuel Proissl Page 4 of 4

More Related