150 likes | 363 Views
EUR PBN TF. PBN ICAO HQ Activities O verview. PBN - Where are we now?. Current PBN concept Globally harmonized navigation specification based on existing national or regional requirement
E N D
EUR PBN TF PBN ICAO HQ Activities Overview
PBN - Where are we now? • Current PBN concept • Globally harmonized navigation specification based on existing national or regional requirement • Objective: facilitation of standardization with the aim to reduce cost, confusion and accelerate implementation
PBN - Where are we now? • Updated PBN Manual (Advance copy): • 1st week of July 2012 New Edition • PBN concept developments • Builds on existing requirements • Adds new specifications to address operational requirements • Curtails the proliferation of number of navigation specifications
PBN - Where are we now? • Updated PBN Manual - highlights • RNP 2 • High continuity (typically oceanic/remote applications) • Low continuity (typically continental applications) • RNP 0.3 • Intended for slow moving aircraft • Radius-to-fix (RF) (terminal and approach) • Fixed Radius Transitions (FRT) (en-route) • Advanced RNP (umbrella navigation specification) • High level ops approval guidance • Improved implementation process description
Advanced RNP A-RNP + options A-RNP Continental en-route: RNP 2,1 Final approach: RNP 0.3 RF legs Parallel offset RNAV holding RNP APCH RNAV 10 RNAV 5 RNAV 1 RNP 1 RNAV 2 RNP 4
Just Published Flight Validation
ATM / Airspace Planning and Design Support • Continuous Climb Operations (CCO) Manual • Advance copy by July 2012 • PBN Airspace Concepts Manual • Advance copy by July 2012 • ilearn information/workshop package on PBN airspace design • August 2012
Flight Operations Support • PBN Operations Approval Manual • Under review by PBN Operations Approval Tiger Team • Advance copy by September 2012 • ilearn information/workshop package on PBN Operations Approval • September 2012
PBN General • PBN Manual next edition • Advance copy July 2012 • ilearninformation/workshop package on PBN overview • September 2012 • Online PBN implementation status tool • September 2012
PBN General • PBN Implementation toolkit addressing: • Executives • Regulators • ANSPs • Aircraft operators • Manufacturers • September 2012
PBN General Instrument Flight Procedures (a summary) • Criteria to support new edition of PBN Manual • Improved Baro-VNAV criteria • Helicopter criteria • Sample charts • State Letter after IFPP/11 (December 2012)
PBN General (Planning) Planning • ilearninformation/workshop/training package on PBN for other domains • ATC • Pilots • Flight validation • Endorsement programme for service providers
PBN General (Planning) Planning • Collision Risk Model for PBN obstacle clearance and air-to-air separation • Combined effort IFPP and SASP • PBN Procedure Design Safety Assessment Manual • Advanced RNP support document
Objectives • New PBN documentation information • Status of global implementation • Identify implementation issues and problems • Development of a global action plan to support implementation • Plan to be presented to ANC/12 • Register at www.icao.int/meetings/pbn-symposium