An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Laboratory for the ALICE O2 project Pierre VandeVyvre September 2013 CERN

  2. ALICE O2 project P. Vande Vyvre • Common DAQ, HLT, Offline project • Online-offline computing after LS2 • Part of the Upgrade LoI of September 2012 and endorsed by the LHCC • Present laboratories: • DAQ • Labs after the transfer from 4-R and 53-R decided in April 2010 (and delivered in December 2011) • 4-S-027: DAQ lab 45 m2 • 4-S-034: DDL lab 34 m2 • HLT: none at CERN • Offline: • 13-R-018: staging room shared with PH-ESE • 13-R-020: 4 racks of servers: Grid central services, AliRoot build and test systems; operation 24/7

  3. Laboratory space P. Vande Vyvre • Present DAQ lab (4-S-027) • Dimensioned for 8 racksPresently with 10 racks (2 from HLT during the work at P2) • Future O2lab • ALICE upgrade started after DAQ lab decision • O2 system currently estimated to ~200 racks • R&D and prototyping: ~10% → 20 racks • => Power: triphase 400 V, 3x160 A. Cooling: 100 kW mininmum. • If possible close to bld. 3, 4, 53, 58 • 3 rooms of 4-R (054, 056, 060) not very much used at preset regrouped together would be adequate

  4. Proposal P. Vande Vyvre • 4-R-054 (PH-ESE): used (2 month/year) by Markus Joos for the TDAQschool (standard infrastructure:needs only power and network, almost every room suits these needs) • 4-R-056 (PH-ESE): kept in case a rack activity is restarted in ESE (high ceiling, mixed water available)-wasn’t it the purpose to group all ESE activitiesin Bldg 13? • 4-R-060(Power and water pipes) . What used for? • 2016: • O2 lab in 4-R-054, 056, 060Work to start Apr 2014 • 2019: • 13-R-020: ALICE to PH-ESE after Run 2 • Offline server infrastructure to be migrated to present DAQ lab (4-S-027)

  5. Schedule Run 1 LS1 Run 2 LS2 Run 3 LS3 Run 4 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024-26 Availability of present DAQ Lab Availability of new O2 Lab Availability of present Offline Lab Start the migration of the DAQ lab to the O2 lab Move of the Offline lab to present DAQ lab O2 Lab infrastructure (Racks, etc) ALICE LS2 Upgrade P. Vande Vyvre