A Revolution in Energy Production. Lakeland Marine Construction started work on site 15 th June 2009. A Revolution in Energy Production. The bedrock was super hard!. A Revolution in Energy Production. The new inlet channel & powerhouse under construction.
E N D
A Revolution in Energy Production Lakeland Marine Construction started work on site 15th June 2009
A Revolution in Energy Production The bedrock was super hard!
A Revolution in Energy Production The new inlet channel & powerhouse under construction
A Revolution in Energy Production Ann keeping a close eye on construction!
A Revolution in Energy Production Reinforced channel for the screw was completed
A Revolution in Energy Production Four months from starting construction-the screw arrives..
A Revolution in Energy Production And was carefully lowered into place
A Revolution in Energy Production A major day in the construction-and look at all that water!
A Revolution in Energy Production And this is what it is all about-the generator
A Revolution in Energy Production -a couple of months later- Safety guarding, disabled access and viewing platform installed and the powerhouse completed
A Revolution in Energy Production And finally commissioned on a frozen 22nd December 2009