1 / 10

UI PRICE AND FREQUENCY

UI PRICE AND FREQUENCY. 448. 49 HZ. 420. 392. 364. 336. 49.5 HZ CORRESPONDS TO RS.2.80. 308. 49.5 HZ. 280. 252. 224. PAISE/UNIT. 196. 168. 50 HZ. 140. 112. 84. 56. 28. 50.5 HZ. 0. 51. 50. 49. 50.9. 50.8. 50.7. 50.6. 50.5. 50.4. 50.3. 50.2. 50.1. 49.9. 49.8.

Download Presentation

UI PRICE AND FREQUENCY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UI PRICE AND FREQUENCY 448 49 HZ 420 392 364 336 49.5 HZ CORRESPONDS TO RS.2.80 308 49.5 HZ 280 252 224 PAISE/UNIT 196 168 50 HZ 140 112 84 56 28 50.5 HZ 0 51 50 49 50.9 50.8 50.7 50.6 50.5 50.4 50.3 50.2 50.1 49.9 49.8 49.7 49.6 49.5 49.4 49.3 49.2 49.1 48.9 48.8 48.7 48.6 48.5 FREQUENCY FREQUENCY vs UI PRICE

  2. Declared Capability & Injection Schedule of NTPC pit head stations in NR (Singrauli & Rihand) 2700 DC Schedule 2555 2530 2600 2505 2491 2500 Average MW 2400 2300 2200 Pre ABT(Dec 01-Nov 02) Post ABT(Dec 02-Nov 03)

  3. Declared Capability & Injection Schedule of NTPC Stations in NR Unchahar- 1 & 2 750 DC Schedule 691 687 700 653 650 Average MW 599 600 550 500 Pre ABT(Dec 01-Nov 02) Post ABT(Dec 02-Nov 03)

  4. Declared Capability & Injection Schedule of NTPC stations in NR Dadri (T) 800 DC Schedule 717 711 750 700 640 619 Average MW 650 600 550 500 Pre ABT(Dec 01-Nov 02) Post ABT(Dec 02-Nov 03)

  5. Declared Capability & Injection Schedule of NTPC Combined Cycle Gas stations in NR (Anta, Auraiya & Dadri) 1800 DC Schedule 1636 1700 1600 1478 1500 Average MW 1336 1330 1400 1300 1200 1100 Pre ABT(Dec 01-Nov 02) Post ABT(Dec 02-Nov 03)

  6. Singrauli & Rihand Dadri (T) 2700 800 Declared Capability Injection schedule Declared Capability Injection Schedule 2555 711 750 717 2530 2600 2505 2491 700 2500 640 619 Average MW Average MW 650 2400 600 2300 550 2200 500 Pre ABT(Dec 01-Nov 02) Post ABT(Dec 02-Nov 03) Post ABT(Dec 02-Nov 03) Pre ABT(Dec 01-Nov 02) Unchahar-1 & 2 Anta, Auraiya & Dadri 750 1800 Declared Capabilty Injection Schedule Declared Capability Injection Schedule 691 1636 687 1700 700 653 1600 1478 650 1500 Average MW Average MW 599 1336 1330 1400 600 1300 550 1200 1100 500 Pre ABT(Dec 01-Nov 02) Post ABT(Dec 02-Nov 03) Post ABT(Dec 02-Nov 03) Pre ABT(Dec 01-Nov 02)

  7. 450 450 450 440 450 10 MW ER to HVPNL 0000 to 1700 & 2300 to 2400 hrs-NVVNL 100 MW ER to HVPNL 0000 to 1700 & 2300 to 2400 hrs-PTC 50 MW GRIDCO to DTL-NVVNL 100 50 MW DVC to DTL- PTC 140 MW ER(DVC, WBSEB) to DTL 0000 to 2400-PTC 100 MW WBSEB to J&K 0000 to 2400hrs- PTC 100 MW ISGS Allocations 0000 to 2400 hrs

More Related