1 / 15

ASM A utoliv S upplier M anual

ASM A utoliv S upplier M anual. Training Chapter 1. S-APQP and 2. Contract Review Process and Templates. 1. S-APQP. 1. S-APQP S upplie r - A dvanced P roduct Q uality P lanning. S-APQP is a structured method of:

Download Presentation

ASM A utoliv S upplier M anual

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ASMAutoliv Supplier Manual Training Chapter 1. S-APQP and 2. Contract Review Process and Templates

  2. 1. S-APQP

  3. 1. S-APQPSupplier - Advanced Product QualityPlanning S-APQP is a structured method of: Defining and establishing the steps and requirements necessary to ensure that the product and process both satisfy the requirements of Autoliv This also ensures that all steps of supplier product launch can be completed on time. This also defines a Quality Road Map for successful launch.

  4. Planned start date filled in by supplier Ready status filled in by supplier on submission of report Name of activities 34 items 1. S-APQP Click here for explanations and requirements to 34 items

  5. Visualized schedule for all items 1. S-APQP Example of correct sequence: SC/CC‘s defined after D-FMEA

  6. Visualized schedule for all items 1. S-APQP Example of incorrect sequence: SC/CC‘s defined before D-FMEA

  7. Ready status filled in by supplier Highlighted status 1. S-APQP

  8. duedate overrun 1. S-APQP

  9. Potential consequences of non-observance: 1. S-APQP - Autoliv and supplier commitment not being met- Missed preproduction deliveries- incorrect tracking to orders or engineering level- PPAP timing not met- high scrap rate- premium freights

  10. ASMAutoliv Supplier Manual Training Chapter 2. Contract Review Process and Template

  11. 2. Contract Review

  12. Purpose: 2. Contract Review • The contract review process is used as a tool for both Autoliv and the Supplier to ensure that the manufacturing process and the product design have been reviewed and established. • The Contract Review process starts after supplier selection and should be finalized before TG 2 and Tool Order. It should be restarted for product design changes. • The contract review clearly communicates Autoliv’s project milestones,(ie: PPAP, Run@Rate, etc) establishing an agreement between both Autoliv and the chosen Supplier. • Contract review is also used to finalize commercial negotiation.

  13. The Contract Review-Template:

  14. The Contract Review-Template: Front page (use always !) A. General (use always !) B. - Z. : Commodity specific use !

  15. Potential consequences of non-observance: 2. Contract Review • Additional costs due to missing requirements ... • capacity issues / concerns • packaging issues • tool order dates • etc. ...

More Related