1 / 12

Rooftop Economizer Service “The First 100 Days”

Rooftop Economizer Service “The First 100 Days”. Completed trainings. Trade allies trained. 1- Astoria 3- Central Oregon / Bend, Redmond (one more on the 18th August ) 3- Southern Oregon / Medford, Grants Pass, Jacksonville 1- Keizer 3- Albany / Corvallis

Download Presentation

Rooftop Economizer Service “The First 100 Days”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rooftop Economizer Service “The First 100 Days”

  2. Completed trainings

  3. Trade allies trained 1- Astoria 3- Central Oregon / Bend, Redmond (one more on the 18th August) 3- Southern Oregon / Medford, Grants Pass, Jacksonville 1- Keizer 3- Albany / Corvallis 26- Portland Metro / Clackamas, Oregon City, 3- Pending Training 12-Trade Allies have turned in 90 projects as of July 30th

  4. Estimated annual savings

  5. kWh &Therm Savings • Total installed savings as of July 30, 2010: kWh 102,978 Therms 4,427 • Total approved not yet installed projected savings: kWh 505,254 Therms 26,652 • Total to be saved for first 100 days: kWh 608,232 Therms 31,079

  6. Savings breakdown

  7. Questions that have been asked. ( The fun part of economizing)

  8. Fun questions • “Can I install an economizer on a 3.5 ton?” • “What if the RTU is on the ground?” • “What is a T87F Thermostat?”(the round one) • “Can I steal my competitors customers?” • “Why can’t I install economizers on Split Systems?”

  9. Post inspections & next steps

  10. Issues found at post inspection • 46 units have had post inspection • All post inspections were done in AM and units were all calling for economizing, except one • 2 units have had repairable issues, and where repaired at time of Post install • One add on economizer had defective common wire and was repaired • One economizer on York unit did not fit correctly over return and had to be corrected

  11. Next steps • Recruit more Trade Allies to the program • Expand area and units to be serviced • Slow expansion to split systems • Follow up this fall with M&V effort (Locally and Central Oregon)

  12. Contact Daniel Wilkinson 621 SW Morrison St. Suite 550 Portland, OR 97205 daniel.wilkinson@lmco.com Direct: 503-243-7687 Cell: 503-729-0562 Fax: 503-243-1154 www.energytrust.org

More Related