280 likes | 297 Views
Structured / Unstructured Market Trials. Weekly Update – Friday Meeting November 1, 2013. Please Help Minimize Call Disruptions. Mute your phones Do not dial-in from a recorded line If you record the call, your “holds” affect everyone Do not put the call on hold even if you are on mute
E N D
Structured / Unstructured Market Trials Weekly Update – Friday Meeting November 1, 2013
Please Help Minimize Call Disruptions • Muteyour phones • Do not dial-in from a recorded line • If you record the call, your “holds” affect everyone • Do not put the call on holdeven if you are on mute Please be courteous of everyone’s time • If necessary, SPP will mute all callers and unmute only at certain times for questions Thank you for your attention to this matter!
Agenda • October 25 Network Outage (5 min) 9:00 – 9:05A • Preliminary Results Oct 28 – Nov 1 (5 min) 9:05 – 9:10A • Settlements(10 min) 9:10 – 9:20A • Analysis Oct 21 – 27 (30 min) 9:20 – 9:50A • Announcements & Outstanding Questions (10 min) 9:50 – 10:00A • Look-Ahead Nov 4 – Nov 11 (15 min) 10:00 – 10:15A • Updates (10 min) 10:15 – 10:25A • Release Scorecard • Migration Report • Known Issues Log • Questions (10 min) 10:25 – 10:35A
Analysis: Friday Oct 25 • Network Outage • SPP will not count Oct 25 as an official OD or Bid to Bill Day Stan Chapman / Casey Cathey
Preliminary Results from Oct 28 – Nov 1 • Scheduled Scenarios • 3A & 3 – Credit Scenarios • 33A & B - Ramp Reservation • Questions? Alan Adams
Credit Scenario 3 Participation • 60 of 105 MPs participated in 3A – No Violation of Credit Limit • 57% Participation • 68 of 105 MPs participated in 3 – Disapproved Credit • 65% Participation Alan Adams
Statistics – Parallel Ops • The following metrics will no longer be included in the Statistics file during Parallel Operations. They can be found in the Portal locations , the format of post Go-Live reporting Alan Adams
Settlements Charge Type Scorecard • The Settlements Charge Type Scorecardfor the week of November 1 is posted. • Includes Operating Days October 14 through October 20. Tony Alexander
Settlements Charge Type Scorecard Tony Alexander
Settlements Charge Type Scorecard Tony Alexander
Charge Types Not Using Stubbed Data • All Charge Types are using upstream data from September 25 Operating Date forward. • 43 Charge Types or 100% of the Charge Types for SMT. • MPs should validate these Charge Types “Bid to Bill”. Tony Alexander
Charge types not using stubbed data • MPs should validate these Charge Types “Bid to Bill”. Tony Alexander
Charge Types Not Included In SMT • ARR/TCR Annual Charge Types • ArrPaybackYrlyAmt, ArrCloseoutYrlyAmt, TcrPaybackYrlyAmt, TcrCloseoutYrlyAmt • Demand Response Load Charge Types • DaDrHrlyAmt, DaDrDistHrlyAmt, RtDr5minAmt, RtDrDistHrlyAmt • Other Various Charge Types • RtJoaHrlyAmt, RtRsg5minAmt • MCRRs/MPRR New Charge Types Tony Alexander
Analysis: Oct 21 - 25 • Structured Market Trials Statistics posted to spp.org spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder > Structured Market Trials Presentations, Statistics, MP Meetings • Analysisof Oct 21 – 25 Operating Days posted to spp.org spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder > Structured Market Trials Presentations, Statistics, MP Meetings Alan Adams
Announcements & Outstanding Questions • Settlements to clear Database on Nov 6 • BSS, Meter Data, and Settlement Results Database will not be cleared and will remain available to MPs • Meter Agents can continue to pull Meter Agent Reports for any OD up to 11-4 • SPP will clear the ETSE Database (Settlements Calculation Engine DB) • SPP will not be able to produce Finals or Resettlements for any of the ODs up to 11-4 • Settlement will start up again with an Initial Settlement for OD 11-12-13 to be posted on 11-19-13 • MPs can continue to bid/offer Nov 4-11 but there will be no Settlements behind any of these activities Ginny Watson
Announcements & Outstanding Questions • Mon Nov 18, 9-10A – Review Known Issue Log • Register on spp.org here spp.org > Integrated Marketplace > Calendar > Marketplace – November 2013 • DA Tags must still be entered during Parallel Ops (after Nov 3) • Real Time Tags are mirrored, Day Ahead Tags must be entered • Please submit an RMS Ticket explaining what you liked or disliked on Friday calls • SPP would like your suggestions for Parallel Operations’ weekly calls Ginny Watson
Wind Resource Offer Parameter PSA • The Day Ahead and Real Time Econ Min and Emergency Min MWs for Wind Resources will be required to be 0 MWs with the installation of v1.7 of the Market Software. • Offers submitted with non-zero Econ/Emer Min MWs will be rejected once the v1.7 Market Software patch is installed. • Some wind resources were not registered with 0 MW minimum outputs. • SPP has overwritten the registration limit to 0 MWs in Prod, so that 0 MW Econ Min offers can be entered. Registration will close the loop on this change. Protocols -- 4.2.2.5.5 Dispatchable Variable Energy Resources (1) The Minimum Emergency Capacity Operating Limit and Minimum Economic Operating Capacity Limit submitted as part of the Day-Ahead Market and/or RTBM Resource Offer must be submitted as zero MW. Otherwise, the Resource Offer will be rejected; Jarrett Friddle
Holiday Proposal No SPP staff running DA Market or DA RUC on holidays listed below. Quality of solutions may be less than a normal supported day. Thanksgiving Day Thursday 11/28 & Friday 11/29 • DA Market and DA RUC: run studies on Wed 11/27 for Thurs 11/28, Fri 11/29 • ID-RUC (COP True-UP): run at least every 4 hours • RTBM: maintain as normal • RTGEN/EMS: maintain as normal Christmas Eve 12/24 & Christmas Day 12/25 • DA Market and DA RUC: run Mon 12/23 for Tues 12/24, Wed 12/25, Thurs 12/26 • ID-RUC (COP True-Up): run at least every 4 hours • RTBM: maintain as normal • RTGEN/EMS: maintain as normal New Years Day 1/1 • DA Market and DA RUC: run Tues 12/31 for Wed 1/01 and Tues 1/02 • ID-RUC (COP True-Up): run at least every 4 hours • RTBM: maintain as normal • RTGEN/EMS: maintain as normal Carrie Simpson
Look-Ahead: Nov 1 – Nov 11 • Scenarios Nov 1 – Nov 11 • 35 Daylight Savings Time • Nov 4 - 11 • MPs can continue to bid/offer, but there will be no Settlements behind any of these activities • The Market Trials Hotline will be closed Nov 4 – 11 • Hotline will re-open for high and critical issues Nov 11 – 27 • Parallel Ops Monthly Calendar on spp.org • spp.org > Integrated Marketplace > Market Trials > Parallel Operations Test> Integrated Marketplace Parallel Operations Project Documents • Parallel Ops Daily Calendar to be posted to spp.org • Nov 12 - Mock Deployment • Beginning Nov 16, Saturdays & Sundays in Nov are available for unstructured testing by MPs Ginny Watson
35 Daylight Savings Time Scenario Description • Twice a year Daylight Savings creates a “Short Day” that contains only 23 hours and a “Long Day” that contains 25 hours. • SPP systems are designed to handle both situations. • This scenario will test the “Long Day” on Nov 3, 2013 Expected Result • MPs should be able to submit all required data • There should be the option to submit 25 hours worth of data with a granularity of hourly (or less) for all submissions • SPP shall accept 25 hours worth of data for all hourly (or less) submissions • SPP shall process all 25 hours worth of data through its systems correctly • SPP shall publish all results for the 25 hours correctly • MPs should be able to query all results and correctly see all 25 hours worth of data from all SPP systems Alan Adams
35 Daylight Savings Time MP Activities • MPs should interact with all of the systems below if they will be utilizing them in the Integrated Marketplace • Market User Interface and API (available 7 days prior to the operating day. For 11/3, MPs may begin submitting bids and offers on 10/27). • Submit at least one Bid and Offer for each parameter that is an hourly for the hour prior, the duplicate hour (HE 0200) and the subsequent hour • Market Notifications: Review all notifications where appropriate to ensure timestamps are correct • Scheduling: Submit DA Market dispatchable and Up to TUC schedules prior to the close of the DA Market to ensure that schedules are created for the extra hour correctly • Ramp Reservation System: Submit for Ramp for extra hour to ensure it is recognized by the system Alan Adams
35 Daylight Savings Time MP Activities - continued • Day Before Day Ahead will run early in the AM on 11-2 for 11-3: Review results of study • Day Ahead will run on 11-2 for 11-3: Review results of study • RUC will run on 11-2 for 11-3: Review results of study • RTBM: Review both XML dispatch instructions to ensure timestamps are correct • RTGEN: Review ICCP timestamps to ensure they are correct • Settlements: Settlement statements; Bilateral Settlements Schedules; Invoices • Public Data: Virtual Reference Prices; Binding Constraints; DA LMP Prices by Bus, By Location; DA MCP; Market Clearing; RT LMP Prices by Bus, By Location; RT MCP; MTLF vs Actual; STLF vs Actual; Day Ahead Wind Forecast; Short Term Wind Forecast Alan Adams
Release Scorecard Release Scorecardposted to spp.org: spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Ginny Watson
Migration and Maintenance Report Migration and Maintenance Report posted to spp.org spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Annette Holbert
Known Issues Log • Please review the Market Trials Known Issues Log on spp.org spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Carrie Simpson
Schedule • Nov 4 – Nov 11 • Note: No Settlements behind these days • Nov 12 – Nov 17 • Parallel Ops Begins Nov 12 • Mock IDT • Scenario 7 – Must Offer • Scenario 28a – Nonfunctional Testing, CMS Outage • Note: Beginning Nov 16, Saturdays & Sundays in Nov are available for unstructured testing by MPs Ginny Watson
Market Trials Useful Resources Hotline: 501-482-2222 for critical & high issues Nov 11-27, M-F 8A – 5P Please submit all other inquiries via the Request Management System (RMS) Settlements Calendar marketplace.spp.org > Public > Settlements > Calendars Integrated Marketplace Parallel Operations Project Documents spp.org > Integrated Marketplace > Market Trials > Parallel Operations Test> Integrated Marketplace Parallel Operations Project Documents Integrated Marketplace Market Trials Project Documentation Folder spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder • Here : Calendar, Release Scorecard, Migration Report, Known Issues Log, MP Guide • SMT Presentations, Statistics, MP Meetings Folder • SMT Reference Documents Folder • Tag Validation Criteria for MT Testing • SMT Scenarios Folder • SMT Scenarios Schedule Change Tracker spp.org > Integrated Marketplace > Marketplace Documents