An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Strumica, September 2013

  2. IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Main Subjects • Design study of road to Stavrochori to Drosato • WP 1 • WP 2 • WP 3 • WP 4

  3. IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Design studyof road to Stavrochori to Drosato • Thessaloniki-Kilkis-Sidirokastro-Promahonas • Stavrochori – Petritsi

  4. IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Design studyof road to Stavrochori to Drosato

  5. IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Design studyof road to Stavrochori to Drosato • 1.500.000€ • 1.200.004,33€ Subsidy Contract • Start 4-2-2010End 31-12-2013 • 570.969,39€ payments by now • 629.034,94€

  6. IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Design studyof road to Stavrochori to Drosato • Length 16,8 km width 17m 5 interchanges • central artery-interchanges-service roads • High way and Road Design • Topographical Design – Cadastre • Environmental Impact Study • Geotechnical Design and Surveys • Structural Design (bridges) • Drainage/Hydraulic Design • Design of Electric Street Lightning • Labeling Study • Health and Safety Plan and File

  7. IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Work Package 1 Management and Coordination Deliverables • 1.2.4 Coordination Meeting Thessaloniki Final Meeting Thessaloniki • 1.2.5 Coordination Meeting Strumica • 1.3.2 4th Progress report

  8. IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Work Package 2 Information and Publicity Deliverables • 2.1.1 Leaflets, banners and info boards • 2.2.1 Web portal • 2.3.1 Closing Conference Strumica

  9. IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Work Package 3 Design Studies & Study for accession infrastructure to the Industrial zones in South-East region Deliverables • 3.1.1 Design Study • 3.2.1 Analysis and preparation • 3.3.1 Printing of the Study • 3.4.1 Dissemination of the Study

  10. IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Work Package 4 Investment guide Actions • 4.1 Preparation of Investment Guide • 4.2 Design and printing of the of Investment Guide booklet • 4.3 Preparation, design and printing of the of CD • 4.4 Dissemination of the Investment Guide and CD

  11. IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Thank you