Explore the comprehensive design study of the road connecting Stavrochori to Drosato, including various crucial aspects like topographical design, structural design, environmental impact study, and more. This project aims to enhance infrastructure connectivity between the regions.
E N D
IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Main Subjects • Design study of road to Stavrochori to Drosato • WP 1 • WP 2 • WP 3 • WP 4
IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Design studyof road to Stavrochori to Drosato • Thessaloniki-Kilkis-Sidirokastro-Promahonas • Stavrochori – Petritsi
IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Design studyof road to Stavrochori to Drosato
IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Design studyof road to Stavrochori to Drosato • 1.500.000€ • 1.200.004,33€ Subsidy Contract • Start 4-2-2010End 31-12-2013 • 570.969,39€ payments by now • 629.034,94€
IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Design studyof road to Stavrochori to Drosato • Length 16,8 km width 17m 5 interchanges • central artery-interchanges-service roads • High way and Road Design • Topographical Design – Cadastre • Environmental Impact Study • Geotechnical Design and Surveys • Structural Design (bridges) • Drainage/Hydraulic Design • Design of Electric Street Lightning • Labeling Study • Health and Safety Plan and File
IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Work Package 1 Management and Coordination Deliverables • 1.2.4 Coordination Meeting Thessaloniki Final Meeting Thessaloniki • 1.2.5 Coordination Meeting Strumica • 1.3.2 4th Progress report
IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Work Package 2 Information and Publicity Deliverables • 2.1.1 Leaflets, banners and info boards • 2.2.1 Web portal • 2.3.1 Closing Conference Strumica
IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Work Package 3 Design Studies & Study for accession infrastructure to the Industrial zones in South-East region Deliverables • 3.1.1 Design Study • 3.2.1 Analysis and preparation • 3.3.1 Printing of the Study • 3.4.1 Dissemination of the Study
IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Work Package 4 Investment guide Actions • 4.1 Preparation of Investment Guide • 4.2 Design and printing of the of Investment Guide booklet • 4.3 Preparation, design and printing of the of CD • 4.4 Dissemination of the Investment Guide and CD
IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307 Thank you