An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integration actions and ECR statusComplex PS (LIU-IONS) LIU-PLI Team Meeting

  2. Integration actions and ECR statusComplex PS (LIU-PSB) LIU-PLI Team Meeting

  3. Integration actions and ECR statusComplex PS (LIU-PSB) LIU-PLI Team Meeting

  4. Integration actions and ECR statusComplex PS (LIU-PSB) LIU-PLI Team Meeting

  5. Integration actions and ECR statusComplex PS (LIU-PS) LIU-PLI Team Meeting

  6. Integration actions and ECR statusComplex PS (LIU-PS) LIU-PLI Team Meeting

  7. Integration actions and ECR statusSPS (LIU-SPS) LIU-PLI Team Meeting

  8. Integration actions and ECR statusSPS (LIU-SPS) LIU-PLI Team Meeting

  9. Work Package Analysis • LHC • LIU New TCDIs • Linac2-Linac4 • LIU Démontage partiel du Linac2 • LIU Connection du Linac4 • PS Booster • LIU New RF FinemetCavities • LIU New Injection Region • LIU Reconfiguration of the injection and extraction lines • PS&TT2 • LIU Linac4 connection (New LBE) + associated tests • LIU BTP modification (full dismantling and installation of new equipment) (to have it grouped with the booster side) • LIU F61 modification (full dismantling, de-cabling, cabling, cooling modification, installation of new equipment, …) • LIU B.269 modification (Power converters installation, CV installation, cabling, de-cabling • LIU Turning the RF cavity SS88 and SS89 by 180o degree • LIU B.355 modifications • LIU B.365 modifications • SPS • LIU RF Upgrade BA3 • LIU New Beam Dump BA1 • LIU New Beam Dump BA5 • LIU aC coating and impedance flange reduction LIU-PLI Team Meeting

  10. Work Package Analysis LIU-PLI Team Meeting

  11. AoB • SMB-SE (Civil Engineering and Metallic Structures) LIU-PLI Team Meeting