110 likes | 116 Views
Integration actions and ECR status Complex PS (LIU-IONS). Integration actions and ECR status Complex PS (LIU-PSB). Integration actions and ECR status Complex PS (LIU-PSB). Integration actions and ECR status Complex PS (LIU-PSB).
E N D
Integration actions and ECR statusComplex PS (LIU-IONS) LIU-PLI Team Meeting
Integration actions and ECR statusComplex PS (LIU-PSB) LIU-PLI Team Meeting
Integration actions and ECR statusComplex PS (LIU-PSB) LIU-PLI Team Meeting
Integration actions and ECR statusComplex PS (LIU-PSB) LIU-PLI Team Meeting
Integration actions and ECR statusComplex PS (LIU-PS) LIU-PLI Team Meeting
Integration actions and ECR statusComplex PS (LIU-PS) LIU-PLI Team Meeting
Integration actions and ECR statusSPS (LIU-SPS) LIU-PLI Team Meeting
Integration actions and ECR statusSPS (LIU-SPS) LIU-PLI Team Meeting
Work Package Analysis • LHC • LIU New TCDIs • Linac2-Linac4 • LIU Démontage partiel du Linac2 • LIU Connection du Linac4 • PS Booster • LIU New RF FinemetCavities • LIU New Injection Region • LIU Reconfiguration of the injection and extraction lines • PS&TT2 • LIU Linac4 connection (New LBE) + associated tests • LIU BTP modification (full dismantling and installation of new equipment) (to have it grouped with the booster side) • LIU F61 modification (full dismantling, de-cabling, cabling, cooling modification, installation of new equipment, …) • LIU B.269 modification (Power converters installation, CV installation, cabling, de-cabling • LIU Turning the RF cavity SS88 and SS89 by 180o degree • LIU B.355 modifications • LIU B.365 modifications • SPS • LIU RF Upgrade BA3 • LIU New Beam Dump BA1 • LIU New Beam Dump BA5 • LIU aC coating and impedance flange reduction LIU-PLI Team Meeting
Work Package Analysis LIU-PLI Team Meeting
AoB • SMB-SE (Civil Engineering and Metallic Structures) LIU-PLI Team Meeting