An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EQUIPMENT RELIABILITY AT KOEBERG Susan van Wyk Reliability Engineering Manager Koeberg Nuclear Power Station

  2. Outline • Setting the Scene: Koeberg Nuclear Power Station • Integration of Equipment Reliability Processes – The INPO AP-913 Equipment Reliability Process • Our Equipment Reliability Journey • Timeline • Integration of Existing Processes • Equipment Reliability Tools • Conclusion

  3. 1. Setting the Scene: Koeberg Nuclear Power Station Unit 2 Unit 1 Turbine Hall • Only Nuclear Power Station in Africa • Two Framatome 920 MWe Units • 3-loop Pressurised Water Reactors (PWR) • Unit 1 began operating in 1984 • Unit 2 began operating in 1985 • Provides approx. 6.5% of South Africa’s electricity • Sister plants: Tricastin and Blayais (EDF) Intake Basin

  4. 1. Setting the Scene: Koeberg Nuclear Power Station • Primary System: Water as moderator and coolant. Boric Acid and Control Rods for reactivity control. • Secondary System: Steam / Water cycle. Steam drives Turbine-Generator sets. • Ultimate Heat Sink: Cold Sea Water

  5. 1. Setting the Scene: Koeberg Nuclear Power Station 3 Steam Generators Containment 3 Steam lines taking steam to the turbine Reactor Vessel 3 Reactor Coolant Pumps Basic PWR Nuclear Island Layout

  6. 1. Setting the Scene: Koeberg Nuclear Power Station • Systems, Components & Maintenance • Number of Systems = Approx. 200 systems • Number of Preventative Maintenance (PM) Tasks = Approx. 62 620 (Online and Outage) • Outage 218 Duration Target ≤ 45 days • Outage ALARA Dose Target ≤ 720 mSv • South Africa’s Electricity Demand vs. Generating Capacity • Challenges during winter and unplanned plant outage periods • Equipment Reliability paramount to availability of plants • Strong Demand Side Management programme to reduce wasteful use of electricity

  7. What is our common enemy? Unexpected Corrective Maintenance of Critical Equipment

  8. 2. Equipment Reliability Guidelines for Nuclear:INPO AP-913 Background • INPO = Institute of Nuclear Plant Operators • INPO developed ER process guidelines • INPO first issued AP-913 “Equipment Reliability Process” in March 2000 • INPO AP-913 provides guidelines to maintain a high level of safe and reliable plant operation in an efficient manner • AP-913 Guides the integration and coordinationof Equipment Reliability activities into one process to: • Evaluate important station equipment • Monitor equipment performance and condition • Make continuing adjustments to the maintenance tasks and frequencies based on equipment operating experience (OE). • Develop and implement long-term equipment health plans

  9. 2. Equipment Reliability Guidelines for Nuclear:INPO AP-913 Background To make sure that: • We are working on the right equipment – Critical Component Determination • We are doing the right maintenance – Maintenance Tasks • At the right time – Maintenance Task frequency • While planning ahead – Life of Plant Planning • And Continually Making Improvements by: • Performance and Condition Monitoring • Recording “As-found” conditions and feeding back to PM programme • Using feedback from the Corrective Action Programme • Having a “Living” Maintenance Programme

  10. 2. Equipment Reliability Guidelines for Nuclear:INPO AP-913 Top Level Diagram

  11. 3. Our Equipment Reliability Journey: Timeline Mid-2007 - Development of “Equipment Reliability” group (3 ppl). Focus on improving PHC (Plant Health Committee) and System Health Reporting Oct 2008 - EPRI AP-913 Gap Analysis – Improvements identified for existing RCM Maintenance Basis EDF / Eskom Contract. EDF fully adopts AP-913, including PM Templates. 2002…. 2006 2007 2008 2009 2010 2011 2002 /3: Organisational Change - Set up for Sys Eng & Comp Eng, SHR,RCM MB, Separate ER Processes Strategy development for further partnerships with EDF and AP-913. Process Integration Maintenance Basis Optimisation Project –identification of failure modes, PM templates 2007 WANO Equipment Reliability Technical Support Mission.

  12. 3. Our Equipment Reliability Journey:Integration of Existing Processes • Review of Component Criticality using EDF classifications as input for improved alignment of maintenance strategies • Maintenance Basis Project to review plant maintenance tasks and frequencies based on Industry and plant OE. • Existing processes require further integration: • System Health Reporting • Component Health Reporting • Performance Monitoring and Trending • Component Failure Assessments, Intrusive Task Assessments, Root Cause Analysis, Corrective Actions • Life of Plant Plans (LOPP) • Maintenance Task and Frequency Optimisation based on real plant maintenance feedback

  13. 3. Our Equipment Reliability Journey:Equipment Reliability Tools • Individual software systems have grown over time, e.g: • system health database, component health database, Life Cycle Management system, Work management systems, Problem Reporting databases, Corrective Action management, RCM software, Maintenance Basis Database. • Integration of Equipment Reliability software for: • Improved processes • Limiting duplication of data entries • Improved monitoring and trending to become more proactive instead of reactive • Avoiding gaps that may exist between processes • Efficiency • Ease of comparison to Industry peer stations with similar software

  14. 4. Conclusion • Our goal is to eliminate unexpected corrective maintenance of critical components • Integration of Equipment Reliability processes for a truly LIVING MAINTENANCE PROGRAMME • Koeberg is continually improving its equipment reliability using the Nuclear Industry guidelines for Equipment Reliability, Industry peer benchmarking, Operating Experience (e.g. EPRI) and partnerships with EDF.

  15. Any Questions?